Télécharger Imprimer la page

Dell S3048 Guide De Mise En Route page 11

Publicité

Les langues disponibles

Les langues disponibles

3.
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. Refer
to item 3 in the following figure.
4.
Repeat this procedure for the second rail.
Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer to
item 1 in the following figure.
2.
Slide the back bracket towards the post and secure it to the post flange
with two user-supplied screws. Refer to item 2 of the following figure.
3.
Repeat this procedure for the second rail.
9

Publicité

loading

Ce manuel est également adapté pour:

E14w