Télécharger Imprimer la page

Titanium wi-1000 Guide D'utilisation page 12

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Capitolo
2. Installation Steps
2.1 Connect the correct electrical power. Refer fig.
2.2.2 installation of film roll.
2.2.1 The bubble film should be cut with a scissors in the
lower right corner before loading the film, Refer fig. B.
2.2.2 Put the roll film on the feeding roller properly. There
is a groove in the roll film.That should align to the feeding
roller protruding part. Refer fig. 3.
fig.B
2.2.3 The roll feeding direction to pass through to the ten-
sion column, Refer fig. 4.
2.2.4 The roll film pass through to the tension column and open the roll film
tensioner to un-lock position. And press to lock position when roll film is pass
through to the tension roller properly. Refer fig. 5.
2.2.5 Roller film pass through the nozzle guide post. Refer fig. 6.
2.2.6 Pulling the roll film to close enough and touch just right between the
hot sealing wheels to ensure when push start button the machine can pull out
film till reach the front pulling wheels, and start making air cushion smoothly.
Refer fig. 7,8.
10

Publicité

loading