Télécharger Imprimer la page

Altech Adoucisseur Primeo Mode D'emploi page 29

Publicité

Les langues disponibles

Les langues disponibles





IMPORTANT: Install the water softener on the cold water system (5°C to 20°C).
IMPORTANT: Install the water softener on the cold water system (5°C to 20°C).
IMPORTANT: Upstream of the water softener, install the following (in sequence):
IMPORTANT: Upstream of the water softener, install the following (in sequence):
-
An unsoftened cold water pipe to supply the kitchen tap (not supplied).
-
An unsoftened cold water pipe to supply the kitchen tap (not supplied).
-
A shut-off valve (not supplied).
-
A shut-off valve (not supplied).
-
A standard isolator (not supplied).
-
A standard isolator (not supplied).
-
The filter with a rating of 20 µm. Change the cartridge regularly,
-
The filter with a rating of 20 µm. Change the cartridge regularly,
in accordance with the manufacturer's instructions (supplied).
in accordance with the manufacturer's instructions (supplied).
-
Downstream of the water softener, install a shut-off valve (not supplied).
-
Downstream of the water softener, install a shut-off valve (not supplied).
Install these recommended accessories using standard unions.
Install these recommended accessories using standard unions.
CONNECTING THE WATER SOFTENER HEAD :
CONNECTING THE WATER SOFTENER HEAD :
-
First, install the bypass on the water softener head.
-
First, install the bypass on the water softener head.








Position the bypass at the rear of the head.
Position the bypass at the rear of the head.
When the bypass is pushed fully home, insert both mounting
When the bypass is pushed fully home, insert both mounting
clamps in the slots provided.
clamps in the slots provided.
Ensure that these mounting clamps are correctly installed before
Ensure that these mounting clamps are correctly installed before
filling the unit.
filling the unit.
BYPASS OPERATION
BYPASS OPERATION


28






Altech

Publicité

loading

Ce manuel est également adapté pour:

6997865