Télécharger Imprimer la page

Taiga-Zone CASTEL Instructions D'assemblage page 12

Publicité

Les langues disponibles

Les langues disponibles

Table A
Pool Diameter
Radius A
9' (2,74m)
5'-5" (1,65m)
11'-0" (3, 35m)
6'-6" (1,98m)
13'-0" (3,96 m)
7'-0" (2,13 m)
15'-0" (4,57 m)
8'-3" (2,5 m)
18'-0" (5,48 m)
9'-6" (2,9 m)
20'-0" (6,09 m)
10'-9" (3,28 m)
23'-0" (7,01 m)
12'-3" (3,73 m)
26'-0" (7,92 m)
13'-6" (4,11 m)
In order to ensure proper water drainage around the pool, erect a two-
degree slope around the perimeter of the pool (See figure below). The
slope is very important. (figure 1.4). No grass, no mulch around the
perimeter of the pool. River stones suggested.
1.4
FOAM INSULATION
COVE
2. ASSEMBLY OF FLEXIBLE PANELS
Use the panel clips (R) and screws (V) to tie together the panels at the
base. For the top, attach the columns (CF) with the screws (W). (figure 2.1)
Column screw tightening should be done manually, using a screwdriver.
It is important to plan the location of your filter system ahead of time, and
to install the filter panel in the right place.
TAÏGA ZONE | TAIGAPOOLS.COM | 12775 RUE BRAULT, MIRABEL, QC, J7J 0C4
The above table indicates the diameter of your pool (A) and the necessary
clearance needed for the crushed stone (B).
Depth A
6" (15 cm)
Add concrete blocks (16" x 8" x 2") on the crushed stone so that the wall
6" (15 cm)
is sitting in the middle of the blocks (figure 1.5).
6" (15 cm)
6" (15 cm)
6" (15 cm)
A
6" (15 cm)
6" (15 cm)
B 11'-5"
6" (15 cm)
WALL
2 degrees slope for better
water drainage
CONCRETE BLOCK
2.1
9'
11'
13'
15'
9'-5"
11'-
"
12'-8
"
15'-3
5/8
13/16
13/16
2,87 m
3,35 m
3,88 m
4,66 m
13'-
"
14'-8
"
16'-7"
5/8
13/16
3,50 m
4,29 m
5,07 m
1.5
18'
20'
23'
26'
"
17'-10"
20'-4
"
22-11"
25'-5
7/16
5,44 m
6, 21 m
7,76 m
7,76 m
19'-2"
21'-8"
24'-3"
26'-9"
5,84 m
6,62 m
7,39 m
8,17 m
(CF)
(R)
"
5/8
2

Publicité

loading