2.0 - TECHNICAL DATA
• Use
• Ambient temperature (TS)
• Power voltages (see table 2)
• Power supply tolerance
• Electric wiring
• Absorbed power
• Maximum operating pressure
• Closing time
• Protection rating
• Mechanical resistance
• Rp threaded connections
• NPT threaded connections
• In compliance with
* Only single-phase, the device does not work if powered with three-phase
3.0 - COMMISSIONING THE DEVICE
3.1 - OPERATIONS PRIOR TO INSTALLATION
• It is necessary to close the gas upstream of the valve prior to installation;
• Make sure that the line pressure DOES NOT EXCEED the maximum pressure declared on the product label;
• Any protective caps (if any) must be removed prior to installation;
• Valve pipes and insides must be clear of any foreign bodies;
• Make sure that the pipe thread is not too long, to prevent damaging the body of the device when screwing it on;
• The safety regulations on handling loads in force in the country of installation must be complied with. If the device to
be installed exceeds the weight allowed, suitable mechanical equipment and adequate slings must be used. Necessary
precautions must be taken during the handling phases so as not to damage/ruin the external surface of the device.
• In accordance with EN 161 a suitable filter must be installed upstream of a gas closing safety device;
• With outdoor installation, it is advisable to provide a protective roof to prevent rain from damaging the electrical parts of
the device.
• Prior to carrying out any electrical wiring operations, make sure that the main voltage matches the supply voltage indicated
on the product label;
• Cut out power prior to proceeding with wiring;
• According to the plant geometry, check the risk of explosive mixture arising inside the piping;
• If the solenoid valve is installed near other devices or as part of an assembly, compatibility between the solenoid
valve and this other device must be evaluated beforehand.
•Avoid installing the solenoid valve near surfaces that could be damaged by the coil temperature;
•Provide a protection against impacts or accidental contacts if the solenoid valve is accessible to unqualified personnel.
3.2 - INSTALLATION
• Assemble the device by screwing it, with the due seals, onto the plant with pipes and/or fittings with the right threading for
the connection being attached.
• Do not use the coil (12) as a lever to help you screw it on, only use the specific tool;
• The arrow, shown on the body (4) of the device, needs to be pointing towards the application;
• The device can also be installed vertically without prejudicing the correct operation. It cannot be put in
upside down (with the reset knob (1) pointing downwards);
• During installation, avoid debris or metal residues from getting into the device;
• To guarantee mechanical tension-free assembly, we recommend using compensating joints, which also
adjust to the pipe's thermal dilation;
• If the device is to be installed in a ramp, it is the installer's responsibility to provide suitable supports or correctly sized
supports, to properly hold and secure the assembly. Never, for any reason whatsoever, leave the weight of the ramp only on
the connections (flanged or threaded) of the individual devices;
• In any case, following installation, check the tightness of the plant;
M16/RAO N.A.
: non-aggressive gases of the three families (dry gases)
: -15 ÷ +60 °C
: 12 Vdc - 24 Vdc - 110 V/50-60 Hz - 230 V/50-60 Hz*
: -15% ... +10%
: cable gland M20x1.5
: see table 2
: 500 mbar (on request 1 bar)
: < 1 s
: IP65
: Group 2 (according to EN 13611)
: (DN 15 - DN 20) according to EN 10226
: request feasibility
: EMC Directive 2014/30/EU - LVD Directive 2014/35/EU
RoHS II Directive 2011/65/EU
8
voltage.
Madas Technical Manual - 3|3.6 - REV. 0 of 10
Sep 2019