6.1.3
DBH08
Insert the extension in the special seating in
the DBH07 base or on the DBH07 bracket.
Fig. 8
Ceiling version.
Fig. 9
Parapet version.
6.1.4
DBH09
Fig. 10
Undo the 4 nuts, size M8, and remove
the flange from the base.
Fig. 11
Fix the base firmly in the desired position.
Insert the DBH07 bracket in the closing
flange and place it on the base so that
the stay bars enter their seating.
Tighten the four M8 nuts, using the
washers, making sure that the bracket
is locked into the desired position.
4 • MNVKDBH06789_0813_EN
7
Disposal of waste materials
This symbol mark and recycle system
n
are applied only to EU countries
and not applied to the countries
in the other area of the world.
Your product is designed and manufactured
with high quality materials and components
which can be recycled and reused.
This symbol means that electrical and electronic
equipment, at their end-of-life, should be disposed
of separately from your household waste.
Please dispose of this equipment at your local
Community waste collection or Recycling centre.
In the European Union there are separate collection
systems for used electrical and electronic products.
8
Technical specifications
8.1
General
Die-cast aluminium
Epoxypolyester powder painting, RAL9002 colour
8.2
Part number
DBH06
Cable management wall mount
DBH07
Cable management ceiling / parapet
mount
DBH08
Linear extension for DBH07
DBH09
Rotating plate for DBH07
8.3
Related products
PTCC1
Pole adapter for DBH06
WCWGC
Corner adapter for DBH06
8.4
Package
Unit Weight:
DBH06
1.3kg / 2.8lb
DBH07
2.8kg / 6.2lb
DBH08
1.5kg / 3.3lb
DBH09
1.6kg / 3.5lb
Package Weight:
DBH06
1.5kg / 3.3lb
DBH07
3.2kg / 7lb
DBH08
1.6kg / 3.5lb
DBH09
1.8kg / 3.9lb
Package Dimensions (BxHxL):
DBH06
24x16x19.5cm / 9.4x6.2x7.6in
DBH08
14.5x12x34.5cm / 5.7x4.7x13.5in
DBH07
19.5x52.5x20cm / 7.6x20.6x7.8in
DBH09
25x25x6.5cm / 9.8x9.8x2.5in