Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3 - INSTALLATION

3.1 - Fitting the splashback
Before installing the hood it is possible to fi t the splash-
back provided, if required.
• Mark the holes required to fi x it to the wall, as shown
in fi g. A.
• Drill the wall (2 holes Ø 5mm) and insert the wall
plugs.
• Fix the splashback to the wall using the two 3x35
screws (provided).
3.2 - Wall installation
The hood can be supplied with two different fi xing kits:
a) screws, plugs and safety square.
b) screws, plugs and metal brackets.
1 - Fixing with screws
Using the cardboard template, mark and drill the holes
on the wall (2 holes Ø 8 mm see instructions on the
template), insert the plugs in the holes, tighten both
4,2 x 44,4 screws(supplied) leaving about 5 mm un-
screwed, hook the hood onto the screws (fi g. 1) and
secure tightly from inside (fi g. 2). Mount the safety
square (supplied) above the hood (fi g. 3).
2 - Fixing with brackets Using the cardboard template,
mark and drill the holes on the wall (4 holes Ø 8 mm
see instructions on the template), fi x the metal brac-
kets with screws and plugs (supplied), hook the hood
onto the brackets (fi g. 4). Fix the hood with two knobs
(supplied) (fi g. 5). Make sure the hood is level and,
if necessary, adjust by acting upon the adjustment
screws (fi g. 6).
3 - Respect warning 2.5.
3.3 – Wall unit installation
Using the cardboard template, mark and drill the
bottom of the wall unit, (see instructions on the tem-
plate).
Fasten the hood from inside the unit using four screws
4,2 x 44,4 (supplied) (fi g.7). For suction hoods, the
wall unit must be drilled to allow for the air discharge
duct. Filter hoods do not require this type of drilling
operation since the air is recycled into the room
through vents situated on the front of the hood.
GB
A
A
2
2
4 4
401_05a
6 6
1 1
3 3
5 5
7 7
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eft 6529

Table des Matières