Installing Inner Channel And Routing Cables - peerless-AV PC930A Installation Et Montage

Support de plafond pour 15 á 40" écrans
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing Inner Channel and Routing Cables

Note: Be certain holes on inner channel (C) face in
3
the same direction of opening on outer channel (B).
Note: Cables must be removed from display
before routing through channels. If cables are not
removable from display, routing through channels is
not an option.
Guide display cables into openings in channels then
insert inner channel (C) into outer channel (B) as
shown in fi gure 3.1.
Position inner channel (C) to the desired height and
secure using two M6 x 12 mm socket pin
screws (L) through clamp plate (D), through opening
in outer channel (B) and into inner channel (C) as
shown in fi gure 3.2.
Insert swivel/pivot bracket (E) into end of inner channel (C) and secure with four M5 x 10 mm socket pin screws (J)
4
as shown in fi gure 4.1 and fi gure 4.2.
Thread two M5 x 10 mm screws (J) into top holes of swivel/pivot bracket (E), leaving 1/8" (3 mm) exposed thread
between head of screw and swivel/pivot bracket as shown in fi gure 4.3.
fi g. 4.1
C
E
OPEN IN G
HOLES
CABLES NOT SHOWN FOR CLARITY
fi g. 4.2
E
7 of 35
fi g. 3.1
B
GUIDE
CABLES IN
C
CHANNELS
fi g. 4.3
J
C
J
1/8"
(3 mm)
ISSUED: 11-29-07 SHEET #: 202-9263-2 08-17-11
fi g. 3.2
L
D
B
C
E
E
J
1/8"
(3 mm)
FRONT VIEW

Publicité

Table des Matières
loading

Table des Matières