Details, Symbols And Abbreviations; Safety Instructions; Design; Installation And Electrical Connection - Watts FRG3020-F Notice De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. DETAILS, SYMBOLS AND ABBREVIATIONS

For better understanding in this document references are used in the form of symbols and abbreviations, which are
described below:
Reference to resuming documents.
Important information and application hints
Safety instructions or important note to the function.
Shut-off: no flow
Open: flow with indication of flow direction
AG
male thread
EUKO male thread with euro cone
FBH
floor heating
FH
radiant heating (generally)
FH/K radiant heating/cooling
FK
radiant cooling
FRG
floor heating control unit

3. SAFETY INSTRUCTIONS

WARNING: Always disconnect the power supply prior to performing any installation or connec-
tion operations!
All installation and wiring work at the unit must be carried out only in an idle condition.
The appliance may be connected and put to operation by qualified personnel only. Make sure to adhere
to valid safety regulations, in particular to VDE 0100 (German standard governing power installations
with nominal voltages ≤ 1000 VAC).
The control units are neither splash- nor drip-proof. Therefore, they must be mounted in a dry place.

4. DESIGN

1:
Floor heating/cooling supply (1" UM)
2:
Floor heating/cooling return (1" UM)
3:
Primary supply (1" AG)
4:
Primary return (1" AG)
5:
Circulation pump
6:
Thermostatic head
7:
3-way-mixing valve
8:
Check valve (RV)
9:
Supply temperature thermometer
10: Temperature limiter (optional)
11: Z-type fitting with immersion sleeve for supply temperature sensor.

5. INSTALLATION AND ELECTRICAL CONNECTION

5.1. M
OUNTING OF THE CONTROL UNIT
The unit is dedicated for flat sealing connecting to a manifold with 1" male thread and distance between supply and
return branch of 210 mm.
Please pay attention not to damage or break the cables of the pump and temperature limiter as well as the capillary
pipe of the thermostatic heads remote sensor while assembling. The cables must be installed without tension.
The correct installation of supply and return has to be ensured (Fig.2 and Fig.3.1 – 3.4).
MuB_10019872_FRG3020-F_(EN)
HK
heating control unit
HKM heating control unit with mixing valve
HKV
manifold
IG
female thread
MuB
installation leaflet
RV
check valve
KFE
fill and drain cock
Subject to technical modification
SKB
gravity flow stop
TB
temperature limiter
UM
union nut
UWP
circulation pump
WDS
heating insulation box
WE
boiler / heat generator
WP
heat pump
ca. 270 mm
10
5
6
7
3
EN
9
11
1
8
2
4
Fig.2
page 2

Publicité

Table des Matières
loading

Table des Matières