3000112 RS DK DE NO SE UK NL FR 211014
Before itting onto the brickwork of a chimney
Step
Action
1
Measure the inside diameter of the chimney and cut the
size of the hole in the mineral wool mat accordingly.
Note that there must always be a minimum of 20 mm of
mat surface at any point around the circumference of the
hole.
NB: The side of the mineral wool mat covered in aluminium
foil is to be placed uppermost, i.e. facing the fan.
2
Mount and fasten the location brackets in the underside of
the base plate by means of the bolts and nuts supplied.
Please notice that the bolt is to be inserted from
beneath.
3
Adjust the distance between the location brackets to it
the inside diameter of the chimney, and then tighten the
nuts. Note that there should be a 2-4 mm gap between
the brackets and the chimney so as to avoid transmitting
vibrations from the fan to the chimney.
A and B measurements – please refer to step 1.
UK •
29