ASSEMBLY
Step 2: Assembling the Vertical Leg Tubes
Connect the Vertical Leg Tubes (6 & 8) with W-shaped tubes (7).
•
Ensure spring-loaded locking pins are aligned with locking holes and pin locks into the secured position.
Step 3: Assembling the Top Rail Frame
Connect Top Rail Tube (16) to the T-shaped Joints (4 & 5). Make sure on T-shaped Joints (5), the side with the
•
welded socket faces away from the centre of the trampoline. Always slide the bigger end of the Top Rail Tube (16)
into the T-shaped Joint (4) first. Repeat this step with the other 11 rail tubes, making a total of 12 top rail sections.
Connect all 12 assembled sections into one circle.
•
Note: When connecting the Top Rail Tube (16) to the T-shaped Joints (4 or 5) be sure that
the opening on each T-shaped Joint is facing the inner side of the Top Rail Frame.
Step 4: Assembling the Leg Tubes to the Top Rail Tubes
Connect the assembled Leg Tubes to the assembled Top Rail Frame.
•
Slide the T-shaped joints (5) into the Vertical Legs (6). Leave the hole without Bolt and Nut at this stage.
The Bolt and Nut will be used in later steps, when the supporting pole is connected as well.
Make sure that the locking tabs on the Vertical Leg Tubes (8) go through the openings on the T-shaped
•
Joints (4).
7