Installation

WARNING:
Shock Hazard. May result in serious injury or death. Before physical mounting, turn OFF electrical
power to all circuit breakers feeding into the panel before installing or servicing this product.
S T E P 1

Connect Fixtures

1.
Place products in intended installation position.
2.
Connect fixtures end to end.
3.
Use jumper cables where appropriate.
4.
Ensure that connectors are completely engaged.
5.
Do not install in a way that puts any pulling force on the cables and connectors.
6.
Affix units to a flat surface using appropriate fasteners (e.g., wood screws, sheet metal screws).
S T E P 2

Attach Terminator

1.
A terminator plug is included with each leader cable.
2.
Insert the terminator into the output connector of the last fixture in the run.
S T E P 3

Connect Leader Cable

1.
One end of the leader cable has a connector and the other end has flying leads.
The connector end of the leader cable connects to the first product in the run.
-
The flying leads end of the leader cable connects to the output side of the N3 Satellite. Note that the
-
leader cable can be cut to length.
2.
Make the connections to the N3 Satellite.
Use Ketra supplied G2 leader cable or if required, conduit or NM type cable as appropriate. (Note:
-
Acceptable wire is both solid core and stranded. Gauge range is 12-18 AWG/2.5-1 mm2.)
Open appropriate terminals by flipping orange levers into UP position (see fig. 7).
-
Make connections to the "Power and Signal Out" section; connecting to appropriate line, neutral, and
-
ground terminals. (Note: wire strip length is 0.47 in [12 mm].) Insert appropriate conductors from Mains
Power (see fig. 7).
continued on next page
10 | G2 INSTALLATION GUIDE