1.2
TRANSPORT, DELIVERY AND ASSEMBLY OF THE MACHINE
Due to freight height and space limitations, some assembly may be required
with your newly purchased micro traveler. Be sure to follow proper procedures
when unloading and assembling the machine to avoid any danger or injury.
Hooks are provided on the machine see (fig.5) to enable you to pick up the
machine for unloading, assembly or repair.
If the machine is delivered with assembled
reel frame, carry out the unloading opera-
tion by hooking as shown in (fig. 6 ).
The machine can be delivered in different versions (with different components).The following instructions concern the machine
with the highest number of components, in case some of these components have already been assembled, follow the specific
instructions.
1) Assemble the wheel hubs and tighten the clamping bolts (fig.7 pos.a).
2) Check the wheel nuts are tight (fig.8). Carry out this inspection
periodically.
3) Check the reel turntable bolts are tight (fig.9).
4) Assemble the trolley lifting arms with relevant accessories (fig.10).
5) Adjust the bolt of the lift of the trolley at about 8 cm (3.1 Inches)
(fig.11)
Fig.6
Inspections to be carried out during assembly:
Fig.7
Fig.9
Wheel Type
11.5/ 80 - 15.3
12.5/ 80 - 15.3
400 / 60 - 15.5
Fig.10
Fig.5
Fig.8
Inflation pressure
Bar
psi
5,6
81,2
5,5
79,8
4,7
68,2
Fig.11
GB
17