Assembly Instructions - Nordcap ROLL-IN 1P TN Notice D'installation, D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The purpose of this section is to allow a trouble-free installation of the
equipment supplied as an assembly kit; it is therefore extremely important
that:
-
You read the instructions contained in this booklet very
carefully, as they will give you important information on installation safety.
-
The Manufacturer declines all responsibility, and the warranty
shall be null and void, if any electrical and/or mechanical alterations are
made to the product, which are not expressly authorised and do not
comply with the instructions given herein.
-
Packing materials (plastic bags, polystyrene foam, nails, etc.)
should be kept out of children's reach as they are potential sources of
hazard, and they should be properly recycled in compliance with local
regulations in force.
IMPORTANT
INSTALLATION MUST BE CARRIED OUT BY PROFESSIONALLY
QUALIFIED PERSONNEL ACCORDING TO THE INSTRUCTIONS
CONTAINED IN THIS SECTION AND IN COMPLIANCE WITH ALL
APPLICABLE SAFETY REGULATIONS IN FORCE, AS REGARDS BOTH
THE EQUIPMENT USED AND THE OPERATIONAL METHODS.
ROLL-IN 1P
Step 1) ROLL-IN 1P and ROLL-IN 2P only
Place the back panel À horizontally
and join the side Á panels by turning
the
standard-supplied
spanner
clockwise, as shown in the photo (*)
Note: If you are assembling a ROLL-IN
2P, secure also the back panel extension
È to the side back panels. À
Secure the bottom assembly ® to the
side Á and back panels À (see photo
of Step 2) (*)

ASSEMBLY INSTRUCTIONS

ROLL-IN 1PP
ASSEMBLY STEPS
Upon delivery, the disassembled equipment is contained in two packages.
1)
Closed wooden box
v
Ç 1 Ceiling assembly (including condensing unit, electrical
equipment and evaporating unit)
v
 1 Bottom assembly
v
Æ 1 Instrument panel (2 for ROLL-INP 2P and ROLL-IN 1PP)
v
2 Rack guides (4 for ROLL-IN 2PP and ROLL-IN 2P)
v
1 Air flow guard
v
Standard-supplied user's manual, screws required for assembling
and spanner.
2)
Open wooden box
v
Á 2 Side panel assemblies
v
Ä 1 Door with hinges and screws required for assembling (2 for
ROLL-IN 1PP and ROLL-IN 2P - 4 for ROLL-IN 2PP)
v
Å 1 Upright (2 for ROLL-IN 2PP - None for ROLL-IN 1P and
ROLL-INP 1P)
v
È 1 Back panel extension (only for ROLL-IN 2P)
v
À 2 Back panels (1 for ROLL-IN 1P - None for ROLL-IN 1PP and
ROLL-IN 2PP)
Check that all components are present and not damaged.
ROLL-IN 2P
Step 2) ROLL-IN 1PP and ROLL-IN 2PP only
Place the two side panels
Á and secure the bottom
panel ® by using M5x40
screws (see photo).
16
ROLL-IN 2PP

Publicité

Table des Matières
loading

Table des Matières