it must, whenever necessary, be replaced. These
inspections must be documented (documentation
of equipment; cf. the following table). It is advisa-
Product inspection record sheet:
Manufacturer:
TEUFELBERGER
Fiber Rope GmbH,
Vogelweiderstraße 50,
A-4600 Wels
Batch No.:
Date of Production:
Compatible components within harness based work at height systems:
Comments:
Written Inspection Record Sheet
Date
Inspection
type
*(p, w, t, e)
*Inspection types: p = pre-use check, w = weekly inspection, t = thorough inspection, e = exceptional circumstances
Model:
Serial No.:
Purchase Date:
Findings and
actions (Defects,
repairs, etc.)
ble to mark the anchor divice with either the next
or the latest date of inspection. Refer to national
regulations for inspection intervals.
Retailer:
Name of User:
Date of First Use:
Accept,
Next
Reject or
inspection
Correct?
date
regular checks
Date of Retirement:
Name and Signature
of competent person
7