LOADING THE DS-3219/DS-3522
1. Disconnect from air supply.
2. Pull back the pusher until it is tucked under the rear of the
magazine in position 1. (FIG.8)
3. Check Staple Leg Length.
Adjustment is provided in the DS-3219/DS-3522 for different staple leg
lengths.
A)
To adjust machine for leg length, loosen set screw (FIG.2)
and turn dial 180˚ with a screwdriver to the desired
adjustment as noted. Tighten set screw.
4. Load the staple stick from the rear of the tool.
5. Slide the pusher from position 1 to the rear of the staple stick
(FIG.9).
6. Clinch Adjustment (FIG.4):
Turn special nut through window clockwise to tighten clinch and
counter-clockwise to loosen clinch. Use a tool to fit 1/8" (3mm) hole.
7. Depth Adjustment (FIG.5):
Loosen front screw and adjust to desired depth. When top edge of
adjustment plate is at highest setting (No. 4), the clinches are at their
shallowest penetration. If set at lowest setting (No. 1), the clinchers are
at their deepest penetration. Note: Tighten screw before firing tool.
8. Stapling:
Grasp handle with one hand. Position on box in line with the desired
staple location. There is a small projection on either side of the frame
as an aid in locating the position of the staple. Press trigger. Move
machine to next staple location with or without releasing the trigger.
Strongest closure requires end staples close to end of box. Check
packaging requirements. Check staple clinching in samples of board
being used. Adjustments for depth of penetration and tightness of
clinch are easy and instantaneous, full advantage should be taken of
them.
9. Always disconnect air supply: 1) Before making adjustments;
2) When servicing the tool; 3) When clearing a jam; 4) When tool
is not in use; 5) When moving to a different work area, as
accidental actuation may occur, possibly causing injury.
Jammed Staple Removal
Remove the remaining stick from the magazine. Pry jam release forward
with a screw driver (FIG.10). Remove magazine (FIG.11). Clear the jam
and re-insert the magazine. Pry jam release shut (FIG.12).
-8-
Position 1
Jam
Release
FIG.8
FIG.9
FIG.10
FIG.11
FIG.12