Typical System; Preliminary Checks; Mechanical Installation - tau T-ONE Série Manuel D'emploi Et D'entretien

Masquer les pouces Voir aussi pour T-ONE Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

To guarantee optimal operation, the unit must operate within the
operating range below the curve.
Important: the curve is obtained at a temperature of 24 °C.
Exposure to direct sunlight may reduce the frequency of use by
up to 20%
Calculating the frequency of use:
This is the percentage of the effective operating time (opening
and closing) with respect to the total time of the cycle (opening +
closing + pause time).
The calculation formula is as follows:
where:
Ta =
Opening time
Tc =
Closing time
Tp =
Pause time
Ti =
Interval time between one complete cycle and the next
Percentuale
% Duty cycle
di lav. %
100
90
80
70
60
50
40
30
20
10
0
1
2
3
4
Tempo (h)
Time (h)

2.2_ Typical system

Figure 3 shows a typical automation system for a sliding gate using
T-ONE.
Description
1
Key-operated selector switch
2
Fixed primary edge (optional)
3
Photocells
4
Mobile primary edge
5
"Open" limit switch bracket
6
Rack
7
Secondary fixed edge (optional)
8
Flashing light with built-in aerial
9
Gearmotor
10
"Closed" limit switch bracket
11
Wireless system
12
Floor-mounted end stops
13
Secondary mobile edge (optional)
Wiring:
The typical system in figure 3 also shows the cables required
for connecting the various devices; the table specifies the cable
specifications.
Connection
Cable type
a:
Mains power line
b:
Flashing light
c:
Antenna
d:
Photocells (TX)
e:
Photocells (RX)
f:
Key-operated selector switch
g:
Primary sensitive edge
h:
Mobile edges
10
% Benutzungs-
% Fréquence
% Frecuencia
frequenz
d'utilisation
de utilización
5
6
7
8
9
10
11
12
Tiempo (h)
Zeit (Std.)
Temps (h)
Ref.
230 Vac
a
3x1,5mm²
b
2x0,5mm²
c
RG58
d
2x0,5mm² (TX)
e
4x0,5mm² (RX)
f*
3x0,5mm²
g
2x0,5mm²
h
2x0,5mm²
* If art. P-300TSL is also installed, envisage a cable 5x0.5 mm for
the key selector switch.
Notes:
If the power cable is longer than 30 m, a cable with a larger
cross-section is required (3 x 2.5 mm2) and safety earthing is
necessary in the vicinity of the automation.
3_
INSTALLATION
T-ONE must be installed by qualified personnel,
in compliance with local legislation, standards,
regulations and these instructions.

3.1_ Preliminary checks

Before installing T-ONE, perform the following checks:
Ensure that all material used is in perfect condition, suitable for
use and compliant with standards.
Ensure that the gate structure is suitable for automation.
Ensure that the weight of the leaf is within the application limits
as specified in paragraph 2.1 "Application limits"
Ensure that there are no points of increased friction at any point
of gate travel, both in opening and closing.
Ensure that there is no risk of gate derailing or risks of exit from
the tracks
Check resistance of the mechanical overtravel stops, ensuring
there are no deformations even if the gate impact is strong on
stopping.
Check that the leaf is balanced and therefore does not move if
left stationary in any position.
Make sure that the fixing zone is not subject to flooding. If
necessary, mount the gearmotor raised from the ground.
Ensure that the gearmotor fixing zone enables safe and easy
manual movement and release.
Ensure that the selected surfaces for installation of the various
devices are solid, protected from the risk of impact
guarantee a stable fixture.
Ensure that parts of the automation cannot come into contact
with water or other liquids
Never place T-ONE in the vicinity of flames or heat sources; in
potentially explosive, particularly acid or saline atmospheres,
this may damage T-ONE and cause malfunctions or hazardous
situations.
If the gate leaf incorporates a pedestrian access door or if this
door is positioned in the gate movement area, ensure that
this does not prevent normal gate travel; if necessary install a
compatible interlock system
Connect the control unit to an electric power line equipped with
an earthing system.
The mains power line must be protected by an adequate
thermal magnetic and residual current circuit breaker device.

3.2_ Mechanical installation

Site location:
Choose a position similar to the outlined area in fig. 4 when
fixing the unit directly to the ground (lay one or two conduits
for routing electrical wiring, 1 fig. 4) if in concrete, or as shown
in fig. 5 when an excavation is required, fig. 5A (right-hand
closure) or fig. 5B (left-hand closure).
Base preparation:
Dig the foundations to a depth of at least 15 cm with sufficient
width. Fit a protective sheath for routing the electric cables.
T-ONE Series
12 Vdc
3x1,5mm²
2x0,5mm²
RG58
2x0,5mm² (TX)
4x0,5mm² (RX)
3x0,5mm²
2x0,5mm²
2x0,5mm²
and

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

T-one5bT-one5T-one8

Table des Matières