carrier immediately if damage is observed. Be sure to save the carton
should you ever need to ship the UPM for repair or maintenance.
Placement
This UPM is intended for indoor use only. Although your UPM is very
Provide a minimum 1" clearance on all sides for proper ventilation.
Applying Power to the UPM
Connect the power cord to a verified grounded 3 wire receptacle. Verify
that the Site Wiring Fault LED is off. Once properly connected and
initially checked, turn on the UPM by pressing and holding the front panel
On/Off switch for 3 seconds.
Operational Tests
Observe the front panel of the UPM. The following table shows how the
front panel LED should appear upon start-up
Load
Indicator
Monitor
LED's
Status
Off
NOTE:
Depending on the charge state of the battery, it is possible that the
battery LED may be flashing (this is normal).
A01-00030 Rev D
rugged, its internal components are not sealed from the
environment. The UPM must be installed in a protected
environment away from heat producing appliances
such as furnaces, radiators, and heaters. Protect the
UPM from exposure to dripping or standing water and
high humidity or condensing air conditions. The location
should provide adequate airflow around the UPM.
Voltage
Manager
Battery LED
Normal
On
Off
Over Temperature
LED
Off
Fault LED
Off
13