Télécharger Imprimer la page

SulfiLogger X1-BCDE-F Manuel D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

3. Calibrate sensor
min. 5 bar
3
5
X ppm
Cal.gas: X ppm
4. Install sensor
a) Wastewater (in the liquid)
1
c
b) Wastewater (in the air)
1
3
2
SulfiLogger™ sensor and PowerCom Box Installation Manual. Revision 112 (Valid from April 2022)
1
2
RED/GREEN
WAIT FOR
6
4
FAST GREEN
3
2
a
b
+5 cm (2 in)
Locate/establish an
anchor point and
mount the PowerCom
Box (if applicable).
Install the sensor.
Manage the cables.
 Verify pressure and gas concentration.
 Calibrate the sensor outdoors or in a well-ventilated area.
Fully attach the calibration cap and rotate it until the notch
aligns with the indicator light and the screw is visible in the
notch.
VERIFY
Verify alternating red/green flashes (ready to calibrate).
Fully open the regulator valve.
Wait for fast green flashes (calibration completed) after 5 - 6
mins.
Fully close the regulator valve.
Remove the calibration cap.
 Install the sensor inside a fixated PVC pipe (min. Ø70mm) if
there is a risk of the sensor hitting well walls or other objects.
Locate/establish an anchor point and mount the PowerCom
Box (if applicable).
Install the sensor and adjust the height while paying
attention to keep:
a) the cables clear of water
b) the front of the sensor submerged when water is flowing
c) the front of the sensor at least 5 cm from the bottom.
Manage the cables.
c) Inline
 Verify pressure & temperature.
Install the flow cell using
appropriate fittings and
mount the PowerCom Box (if
2
applicable).
Insert the sensor.
1
 The index plungers must be
fully inserted and locked.
EN
Page 5

Publicité

loading

Ce manuel est également adapté pour:

SensorPowercom box