Télécharger Imprimer la page

Pfister Marielle 34 Serie Instructions D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

17
17E
17A
17 FAUCET INSTALLATION
With the handle and spout facing forward, carefully install the Faucet Supply
Tubes (17A) through the center hole of Deckplate (17B) or Mounting Ring (17C).
Make sure that the Flats (17D) on the Faucet Body (17E) align with the Flats
(17F) on the Deckplate (17B) or Mounting Ring (17C).
18
18C
18A
18 MOUNTING HARDWARE INSTALLATION
From underneath sink, secure the faucet by placing the Metal Washer (18A) and
7
the Long Nut (
/
Hex.) (18B) onto the Mounting Post (18C). Make sure that
16
the bumps on the Metal Washer (18A) are facing up. Tighten using a flathead
screwdriver or an adjustable wrench until the faucet is firmly connected to the sink.
Do not over tighten!
17E
17D
17F
17C
17B
18B
ENGLISH
19
19D
19 WATER SUPPLY LINES
Gently separate hot and cold Supply Tubes (19A), approximately three inches
apart. Connect water Supply Lines (19C) to Faucet Inlets (19B). Hot water
supply line goes to hot inlet fitting indicated by red tag (19D). (Supply lines not
included). Follow manufacturer's instructions when installing supply lines. Do
not twist Supply Tubes (19A)!
20
20 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
21
21 SPOUT FUNCTION
The Spout (21A) can be rotated around the Faucet Body in any direction.
5
19A
19B
19C
19C
HOT
FAUCET FUNCTIONS
21A
COLD

Publicité

loading