Kichler 60 HATTERAS BAY Manuel D'instructions page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STANDARD CEILING INSTALLATION
Step 1. Remove the hanger ball from the downrod assembly by loosening the set screw,
removing the cross pin and sliding the ball off the rod. (Fig. 6)
Step 2. Loosen the two set screws and remove the hitch pin and retaining clip from the
coupling on top of the motor assembly. (Fig. 6)
Step 3. Carefully feed the electrical lead wires from the fan up through the downrod.
Thread the downrod into the coupling until the Hitch pin holes are aligned.
Next, replace the hitch pin and retaining clip. Tighten both set screws. (Fig. 6)
Step 4. Slip the coupling cover, decorative mounting screw cover and canopy onto the
downrod.
Thread the hanger ball onto the downrod, insert the cross pin through the downrod and
tighten. Now tighten the set screw. (Fig. 6)
8 | KICHLER.COM
Cross pin
Hanger
ball
Supply wires
Set screw
Downrod
Decorative
mounting
screw cover
Coupling cover
Coupling
Set screws
Set screws
Hitch pin
Fig. 6
Canopy
Retaining pin

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hatteras bay led

Table des Matières