Operation; Preparing To Work; Overflow Device - BETCO GENIE APS E83039-00 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. PREPARING TO WORK

The followings procedures must be done before installing the tanks:
1. Open the two rear hinges on the battery compartment
2. Connect the connector to the batteries
3. Close the battery compartment
Now install the tanks
4. Prepare the machine for operation
5. Lower the squeegee control lever and start to work
6. Press the main switch (1) and check that the green signal lamp is on
7. Press the aspiration switch (2)
8. Press the solenoid valve switch (3)
At this point the machine can work efficiently, using the operating lever that operates the brushes
(4), until the detergent solution is finished.

2. OVERFLOW DEVICE

The machine has a ball filter that trips when the recovery tank is full, closing the auction tube.
At this point you must empty the recovery tank.
ATTENTION: Always wear gloves when doing this operation to protect
yourself from contact with hazardous solutions.

OPERATION

12
2
4
1
3
4

Publicité

Table des Matières
loading

Produits Connexes pour BETCO GENIE APS E83039-00

Ce manuel est également adapté pour:

Genie aps

Table des Matières