After Work Is Terminated - BETCO GENIE APS E83039-00 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Proceed as follows at the end of the work cycle and before you perform any type of maintenance:
1. Turn off the solenoid valve switch (3)
2. Lift the squeegee
3. Turn off the aspiration switch (2)
4. Turn off the brush/main switch (1)
5. Move the machine to where water is to be drained
6. Remove the drain plug and empty the tank
7. Dismantle the brush and clean it with a jet of water (see "DISMANTLING THE BRUSH" below in
order to dismantle the brush)
ATTENTION: Always wear gloves when doing this operation to protect
yourself from contact with hazardous solutions

AFTER WORK IS TERMINATED

14
2
1
3

Publicité

Table des Matières
loading

Produits Connexes pour BETCO GENIE APS E83039-00

Ce manuel est également adapté pour:

Genie aps

Table des Matières