STEP 5 SLIDE UNIT INTO ENCLOSURE
Roll the unit into the enclosure, being careful not to pinch
the water line or power cord.
• A long flat bar or yard stick may be needed to guide the
front edge of the anti-tip bracket over the unit.
• If space allows, you may also bend the front edge of the
bracket upward slightly, allowing it to clear the back of
the unit.
• Remove Top-Center trim cover from unit.
• Secure the unit to the Anti-tip bracket using both
machine screws & washers to engage the threaded
inserts in the anti-tip bracket.
• Hand start the screws until unit is in desired location
within the install space.
• Finalize unit install by tighening the screws fully.
• Reinstall Trim cover.
Installation Instructions
15
STEP 6 REMOVE TOEKICK AND VENT
The toekick must be removed to access
the leveling leg system.
• Remove band around EPS block in front of toekick.
• Remove and dispose of EPS block.
• Remove the solid portion of the toekick by pulling forward.
• Place the toekick, vent and screws out of the way so you
will have them for reinstallation.
Vent
Screws
(behind
toekick)
Screw
Vent
Screw
Toekick