5. Trial run
•
Make sure the required operating voltage and the power supply's voltage match.
•
Make sure the socket is earthed.
•
Add the substance to heat in the testing tube and place it on the work plate.
•
Plug in the power inlet, and turn on the "POWER" (1) switch.
•
Set the target temperature with the T º button (4) and adjust it with the knob (2). You shall see the required
temperature on the screen (7)
•
Set the time, with the timer button (3) otherwise, the machine will work continuously. The selected time should
appear on the timing screen (8)
•
Press the parameter setting knob (2) to start the heating function.
•
While the device is on, the heat led (6) will be on (yellow light) and if the timer has been set, the timer led (5) will
also be on.
•
On the Tº display (7) working temperature shall appear. If the timer has been set, the adjusted time will show on
the time display (8)
•
If the heat increases and the timer is counting down, the device is working properly.
6. Handling
•
Place the equipment in a plane and stable surface, leaving at least 100 mm of free space on each side. Make sure
that the surface is adequate for the weight of the equipment.
•
Add the substance into the testing tube and place it on the work plate.
•
Plug the appliance, and turn on the "Power" switch.
•
Wait until the device finishes the initializing process, the real temperature of the device will appear on the screen
(7).
•
After adjusting temperature and timer (if necessary), press the adjusting knob (2)
•
The heat (6) and time (5) LEDS shall stay on (yellow)
•
After use, the device must be turned off using the "Power" button (1) and unplugged.
•
Make sure the device stays unplugged while is not being used for long periods
6