Installation - Klarstein SECRET SERVICE Mode D'emploi

Masquer les pouces Voir aussi pour SECRET SERVICE:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
20

INSTALLATION

If you have an outlet to the outside, your cooker
hood can be connected as below picture by
means of an extraction duct (enamel, aluminum or
incombustible flexible pipe with an interior diameter
of 150/120mm).
Installation
Before installation, turn the unit off and unplug it from the outlet.
Step 1
Ceiling
Decorative board
The cooker hood should not
be placed at a distance of
more than 150cm from an
electric hob or gas hob for
the best performance.
Step 2
The ceiling must can bear at least 120kg weight,
and the thickness of the ceiling must be ≥30mm.
According to the cooker hood size, drill 4 anchor
bolt holes with 8mm diameter on the ceiling once the
installation height is determined.

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10031697

Table des Matières