400
400
205
205
WARNING!
- Shut-off the flow closing the ball valves "DCW supply" ref. 1
and "DHW outlet" ref.2
- Remove the cap (1"F ) to the T_Fast module as indicated in
the pic.3
- Install the recirculation kit (ref.4) screwing watertight the nut.
- Input 230V.
- Set return circulation temperature from the control panel of
the pump.
2204010 - 05.13
6. Messa in funzione del modulo
65 65
65 65
65 65
65 65
7. Circulation kit connections and technical data
7. Circulation kit connections
Ball valve
4
Check valve
Assembling instructions and maintenance
6. Module start-up
1 - Fill the primary circuit.
2 - Fill the secondary circuit (hygenic water) through the load/unload caps.
3 - Check the hydraulic tight and venting the air.
4 - Powering the module.
5 - Check the correct working of the module.
TERMINAL BOARD
CIRCOLATORE
3
2
1
L
N
1 2
18