Telephone connection : Voltages present on the
telecommunication network are classified TNV-3
(Telecommunication Network Voltage) according to the
EN60950 standard.
Setting up Door bell
1. The door bell can be take with the people who need
the assistance.
2. The door bell can be fixed on the wall or door
surround, drill two holes horizontally, 14mm apart,
put the supplied anchor into the two holes, hang the
door bell on to the two anchors and then instert and
tighten screws, and then stick the blank sticker on the
two holes.
3. The door bell can be stick onto a door, window using
the supplied strong adhesive tape. Remove the
protective paper from the adhesive tape on the back
of the door bell and stick to the required window.
Wall Mounting
1. Drill two holes horizontally, 96mm apart, and leave the
screws protruding from the wall by 5mm.
2. Hang the base on to the two screws and pull the base
down to lock it on.
INSTALLATION
3