Tests - Karibu Modern Finnisch Mode D'emploi

Commande sauna fonctionnement avec temps de présélection
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Assembling Instructions for Specialist Staff Only
4

Tests

Tests have to be conducted by an authorized electrical
engineer.
WARNING - Danger of Electric Shock:
The following tests have to be conducted with
supply voltage turned on.
1. Test contact to protective-conductor terminal.
2. Testing the safety shutdown of the stove sensor /
fuse with line:
-
The lines have to be disconnected at the stove sen-
sor to include the stove sensor lines in the test.
-
When disconnecting the white or red stove sensor
lead and when the white lead shorts out, the heating
system has to shut down by itself (red signal lamp
1 flashes).
3. Test the phase interconnection for the sauna ope-
ration L1, L2, L3 to U,V,W.
• 19 •