Checking Operation (E) - Asko HG1666AB Installation

Installation d'un autre type de gaz
Masquer les pouces Voir aussi pour HG1666AB:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16
CONVERSION INSTRUCTION

Checking operation (E)

EN 8
1. Ignite the burners.
2. Check whether the flame profile is uniform and stable for the
complete ratio (see illustrations E1, E2 en E3, at the back of this
instruction).
• Check if the flame does not smother in simmer rate;
• Check if the flames are not 'blowing off' at maximum rate;
• No long, yellow flames should be visible during operation.

Publicité

Table des Matières
loading

Table des Matières