Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Step 1: Determine Installation
Configuration. The PDU supports four primary
installation configurations: 1U Rack, 0U Rack,
Wall and Under-Counter. Choose a
configuration and follow the installation
instructions in the appropriate section of Step
1 before proceeding to Step 2.
Note: Regardless of installation configuration,
the user must determine the fitness of
hardware and procedures before mounting. The
PDU and included hardware are designed for
common rack and rack enclosure types and
may not be appropriate for all applications.
Exact mounting configurations may vary.
Step 1-1: 1U Rack Installation. Attach the
PDU to the rack by inserting four user-supplied
screws (A) through the PDU mounting brackets
(B) and into the mounting holes of the rack rail
as shown.
Step 1-2: 0U Rack Installation. Part 1:
Remove the screws (C) attaching the mounting
brackets to the PDU, change the orientation of
the brackets as shown and reattach the
brackets. Use only the screws supplied by the
manufacturer or their exact equivalent (#6-32,
1/4" flat head). Part 2: Attach the PDU
vertically by inserting two or more user-supplied
screws (A) through the PDU mounting brackets
(B) and into mounting points in the rack or
rack enclosure.
Step 1-3: Wall Installation. After repeating
Part 1 above, attach the PDU to a stable
mounting surface by inserting two or more
user-supplied screws (A) through the PDU
mounting brackets (B) and into secure
mounting points on the mounting surface.
Step 1-4: Under-Counter Installation. After repeating Part 1 above, attach the PDU to a stable
mounting surface by inserting four user-supplied screws (A) through the PDU mounting brackets (B)
and into secure mounting points on the mounting surface.
Step 2: Connect PDU to Grounded Outlet. The PDU includes
several plug adapters which allow the PDU to connect to various
outlet types. After choosing the appropriate plug adapter for the
required application, insert the IEC-320-C19 connector (D) of the
adapter into the IEC-320-C20 connector (E) of the input cable.
Secure the connection with the Cord Retention Bracket (F) by using
the included bolts to fasten the two halves of the bracket around the
connection as shown. Insert the plug directly into a properly grounded
AC outlet that does not share a circuit with a heavy electrical load
(such as an air conditioner or refrigerator). Caution: The Line (L1)
conductor includes an over-current protective device for safety. To
avoid the risk of electric shock, ensure that the Neutral (L2)
conductor has been identified before connecting the PDU.
14-02-336-932537.indb 3
B
1-1
B
1-2
B
1-3
B
C
1-4
2
3
A
A
C
C
A
C
A
F
D
E
4/24/2014 12:22:42 PM

Publicité

Table des Matières
loading

Table des Matières