Assembly; Assembly Dimensions; Installing The Burner; Service Position - ACV BMV Serie Notice D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
FR
NL
ES
Figure 7
IT
DE
PL
RU
Figure 8
1
Figure 9
en
4
Service screw
3
spacer ring
2
2,5 mm
BMV3 / BMV4 / BMV5 : 662Y1000 • A
2.

ASSEMBLY

2.1.

Assembly dimensions

The dimensions of the burner and boiler connection are ac-
cording to DIN EN 226 (dimensions in mm), see figure 7.
2.2.

Installing the burner

• Install sliding flange and seal onto the heat generator us-
ing the supplied M8 screws. The mounting screw of the
sliding flange must be turned upwards.
• Insert burner with burner pipe into the flange until the
burner pipe is flush with the inside of the combustion
chamber. Observe special instructions of the heat genera-
tor manufacturer, if any.
• Tighten the mounting screw of the flange clamp.
Caution: The flange must be oriented to ensure that the
burner is installed with the correct angle (see fig. 6).
• Install the recirculation tube.
2.3.

Service position

Loosen the service screw by 1/2 turn using a 4 mm hexagon
socket wrench (see fig. 8). Turn the burner to the left and re-
move it from the burner pipe. Then, place it in the service
position (see fig. 9).
2.4.
Change of the nozzle
• Loosen screw (2) using a 4 mm hexagon socket wrench
and remove the baffle plate (1) (see fig. 9).
• Select a new nozzle according to the required perfor-
mance range (see table on page 9).
• Remove installed nozzle (3) and screw on the selected
nozzle (see fig. 9).
• Check the distance between the baffle plate (1) and the
nozzle (3) (see fig. 10).
Install the baffle plate (1) back in place and tighten the
screw (2).
Caution: The baffle plate and nozzle could be hot!
• Control and re-adjust the ignition electrodes if necessary
(see fig. 10).
Bring the burner in operating position and tighten the
service screw.
2.5.

Nozzle table

The oil flow rate specified in the nozzle table refers to a vis-
cosity of the preheated heating oil of approx. 2 mm2/s.
2.6.
Combustion chamber – minimum dimensions
According to GN 267, low-emission combustion values can only
be reached if the combustion chamber minimum dimensions
are complied with.

Combustion chamber - minimum dimensions

Diameter resp.
Oil flow rate
height and width
1.0 - 2.0 kg/h
Ø 225 mm
2.0 - 6.0 kg/h
Ø 300 mm
Depth from the baffle
plate
250 - 350 mm
350 - 612 mm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bmv3Bmv4Bmv5

Table des Matières