2.1
Unpacking
Remove packing materials carefully, and retain for future shipment or storage of the unit.
Packs should contain:
2.1.1
Controller
Pump outlet plastic moulding, Operating instructions
Mains lead
Clamp (Where applicable)
2.1.2
Tanks (Stainless steel)
Tank
Bridge plate Circulation tray (except S5and S12)
Three screws M3
Screw M5
2.1.3
Tanks (Plastic)
Tank
Bridge plate
Clamp
2.2
Assembling control unit for use as bath controller or immersion thermostat
2.2.1
Bath controller-stainless steel tanks, S12, S18, S26 and S38.
The controller can be fitted to the bridge plate in either of two positions. These
are, on the left hand side facing into the working area of the bath or on the left
hand side of the bath facing out. Fit the controller through the hole in the
bridge plate and align the holes with the three screw fixings in the base of the
controller. Then using the three M3 screws supplied fix the controller to the
plate. Note; the controller position cannot be changed after placing through the `
hole, it must be lifted out and then rotated.
Fit the lip of the bridge plate into the gap between the cut out in the plastic
case and the tank in the top left hand corner of the case such that the lip of the
bridge plate is lodged under the lip of the tank. Fix the bridge plate to the bath
using the M5 screw, this goes through hole in the rear of the bridge plate and
screws into the case.
Fit the circulation tray in the base of the tank with the large cut out in the tray
underneath the control unit (models 12L and above).
GD100, GD120
Operating Manual
www.grant.co.uk
2. Assembly
17090 Version 15 - June 2009 83S
EN
Page 4