Little Giant APA-05-HAR Manuel Du Propriétaire page 7

Masquer les pouces Voir aussi pour APA-05-HAR:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

c) Position the float where desired on the pond.
i. If anchoring the float to the pond bottom, lower one anchor block to the pond bottom, position the float where
desired and lower the other anchor block to the pond bottom, each oriented so that the ropes are at an angle to
the float (Figure 1).
ii. If mooring the float to the shore, position the float where desired and tie the mooring ropes to secure mooring
anchors on opposite shores.
Water Level
Pond Bottom
d) Install the aeration pump/motor assembly to the float. No mounting hardware or tools are needed.
i. Lower the motor end first through the hole in the center of the float and into the water.
ii. Rotate the pump/motor assembly so the power cord is oriented with the power cord channel in the float
(Figures 2 and 3).
iii. Continue lowering until each support tube rests in its corresponding float recess.
iv. Tuck power cord along channel of float until it exits from the float and into water.
v. Connect lanyard to eye-bolt of float (Figures 2 and 3).
Propeller Pump Nozzle
Power
Cord
Lanyard
Step 3
Proceed to Electrical Connections section.
Float
1/4" Polyethylene Rope
(Length ~3 times water depth)
Support Tubes
Motor
Figure 2
Power Cord
Figure 1
Anchor/
Mooring Hole
Power Cord Channel
Electrical Service on Shore.
(Note actual location
of service must comply
with national and local
electrical codes)
Concrete Block
Anchor/
Mooring Hole
Support
Tube Recess
Eye-Bolt Hole
Figure 3
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Fph-05-k01517300517310

Table des Matières