Klarstein LA PALMA S 500 Mode D'emploi page 23

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
Step 1. Use the supplied template to mark the position of the holes on the wall.
Step 2. Drill holes using a 8-mm drill.
Step 3. Insert the dowels into the holes.
Step 4. Screw in the supplied screws to the wall.
Step 5. Mount the panel on the screws.
Step 6. Move the panel to the left and then down until it is secured.
23

Publicité

Table des Matières
loading

Table des Matières