Commissioning/Decommissioning

6
Commissioning/Decommissioning
6.1

Commissioning

NOTICE
Make sure that the pool does not overflow and cause property
damage.
Check that there is a drain.
Check whether a safety time is set.
6.2

Functional test

6.2.1

Function start

The BADU BNR 400 starts with the program. The LED indicates
certain operating states. See point 3.1.5 on page 11.
The status screen is shown in the display when starting.
6.2.2

Shut-off fittings

The correct operation of the refilling device must be checked
separately. A solenoid valve or fast ball valve is usually used for
this.