CHAPTER 3. START-UP. ADJUSTMENT AND OPERATION CONTROLS.
In principle, the connection of the system and the preliminary operations must be carried out as indicated in
sections 2 and 3 of the GPS power source instructions manual.
3.1 FRONT PANEL. CONTROL KNOBS.
F
K
G
A- SISTEMA DE CONTROL UNIVERSAL
B- FUSE-HOLDER. FUSE DIN 6X32 DE 2 A – 5 A / 250 V
C-D- IN/OUT COOLING WATER. (KIT OPTIONAL Ref. 61812060)
F- FEMALE EURO-CONNECTOR.
G- PATIN FOR SLIDING ON GROUND
K- FEMALE BASE PANEL CONNECTOR 9V. TORCH CONTROL SW4.
C-D
D-GPS 5 Kg
H- ENTRY GAS PROTECCION
I- CONTROL CONNECTOR
H
J- POSITIVE CONNECTION WELDING POWER
I
J
11
E
A
B
C- D