Installation Preparation - GE GDF510PSJSS Directives D'installation

Table des Matières

Publicité

Installation Preparation

PARTS SUPPLIED
IN INSTALLATION PACKAGE:
MATERIALS YOU WILL NEED:
Materials Needed for
New Installations:
WX09X70911
WX28X326
WD24X10065
TOOLS YOU WILL NEED:
For New Installations Only:
2
Insulation
90° Elbow
WXO9X70910
Waste Tee
Air Gap
Phillips-Head
Screwdriver
15/16" Socket
Flashlight
Bucket
#8 Hex-Head
#10
Hex-Head
Junction
Box Screw
1/2" long
Junction
Box Cover
Side Trim Pieces
(on some models)
Thread
Seal Tape
(if applicable)
Hand
Electrical Cable
(or Power Cord, if applicable)
Valve
Hose Clamps
Strain Relief
1/4" and 5/16"
Nutdriver
Pliers
6"
Adjustable
Wrench
Gloves
Hole Saw Set
Hose
Mounting
Clamp
Bracket
Screws
Plug Buttons
Toekick
Drain Hose Hanger
Mounting
Brackets
Wire Nuts (3)
Masking Tape
(if applicable)
Hot Water Line
Optional
12' Drain Hose
Level
Carpenter's
Square
Tubing Cutter
Measuring Tape
Safety Glasses
Drill and Bits
Drain Hose
#8 Phillips
Special
Head Screws
5/8" long
Coupler for
optional drain
hose

Publicité

Table des Matières
loading

Table des Matières