Page 1
MARYLOU 60 INSTALLATION MANUAL | MANUEL D’INSTALLATION | MANUAL DE INSTALACIÓN Questions, problems, need help? Call our customer service department at 1-866-839-2888, 9 a.m. - 5 p.m., EST, Monday - Friday Questions, problèmes ou besoin d’aide? Contactez notre service à la clientèle au 1-866-839-2888, du lundi au vendredi de 9 h à...
TABLE OF CONTENT TABLE DES MATIÈRES TABLA DE CONTENIDOS TABLE OF CONTENT ........2 TABLE DES MATIÈRES ........2 TABLA DE CONTENIDOS ........2 SHOWER DIMENSIONS ........3 DIMENSIONS DE LA DOUCHE ......3 DIMENSIONES DE LA DUCHA ......3 WALL-TO-WALL DIMENSIONS ......
SHOWER DIMENSIONS DIMENSIONS DE LA DOUCHE DIMENSIONES DE LA DUCHA Measurements Mesures Medidas Shower height Hauteur de la douche Altura de la ducha Shower width (Min. without cutting the bar) Largeur de la douche (Min. sans couper la barre) Ancho de la ducha (Min. sin cortar la barra) Fixed panel width Largeur du panneau fixe Ancho de panel fijo...
WALL-TO-WALL DIMENSIONS MESURES MUR-À-MUR MEDIDAS DE PARED-A-PARED • Make sure to have a distance tile to tile (D) between 148.5 cm (58 7/16 in) min. and 152.5 cm (60 1/16 in) max. (see image). • Measure the thickness of your tiles on either side before installing the metal tracks. A thicker tile will limit your space to install the shower panels.
INSTALLATION STRUCTURE OVERVIEW VUE D’ENSEMBLE DE LA STRUCTURE D’INSTALLATION VISIÓN GENERAL DE LA ESTRUCTURA DE INSTALACIÓN 1. Before you start the installation of your product consult the illustration 1 below showing a side-view of the completed installation. 2. Illustration 2 shows the recommended wall structure and measurements for the product installation. NOTE: Customer must follow and comply with the local and national building and plumbing codes.
PART LIST LISTE DES PIÈCES LISTA DE PIEZAS PART # DESCRIPTION QUANTITY CODE # DE PIÈCE DESCRIPTION QUANTITÉ CODE PARTE # DESCRIPCIÓN CANTIDAD CÓDIO Sliding door guide (with its rubber fitting) Guide de porte (avec bande d’étanchéité) Chrome / Chrome / Cromo: 99SGC2037 Guía de la puerta (con tira de sello) Wall track...
PREPARATION PRÉPARATION PREPARACIÓN This instruction is drawn up for a door opening from right to left (see illustration A). For an installation for a door opening from left to right (see illustration B), use the same instructions, but switch around the panels: mirror effect. Utilisez ces instructions pour une ouverture de la porte de droite à...
SAFETY INFORMATION INFORMATION SUR LA SÉCURITÉ INFORMACIÓN DE SEGURIDAD CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: •...
SAFETY NOTICE AVIS DE SÉCURITÉ AVISOS DE SEGURIDAD NOTICE Any modification or alteration from what is specified in this instruction manual will void any and all warranty on this product. The distributor is not responsible for any damage to the unit or personal property caused by improper installation. If you disregard instructional warnings, you will void your warranty and possibly deal with water damage.
WALL TRACK INSTALLATION INSTALLATION DE LA GLISSIÈRE INSTALACIÓN DEL RIEL DE PARED 1.1-1.2. Position the wall track (B) as illustrated. Level the track (B) and mark the track holes positions. 1.3. Remove the track and drill pilot holes in the marked locations with a ø8mm (5/16 in) drill bit. 1.4.
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE 2.1. Insert the fixed panel bottom seal strip (N) on the base of the fixed panel (C). Cut the surplus part with a cutter, about 4 cm (1 9/16 in) from the panel’s edge. 2.2.
NEXT STEP MAY REQUIRE TO TRIM THE SUPPORT BAR If the support bar is too long for your wall-to-wall opening “D”, you will have to trim it down. Below calculation is for reference only: Ensure you made all the proper measurements before you cut the bar. 1.
Page 16
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE 3.1. Install the fixed panel’s bracket (G) and the support bar anthors (D) onto the support bar (F). 3.2.
Page 17
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE 4.1-4.2. Place the support bar (F) in order to align the bracket (G) in front of the fixed panel’s hole. Position the support bar so that the A and B measurements in illustration 4.1 below match the A and B measurements in illustration 4.2 respectively.
Page 18
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE 5.1. Drill a pilot hole for the sliding door guide (A) using a ø3mm (1/8 in) drill bit. 5.2.
Page 19
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE 6.1. Disassemble the door rollers (H). 6.2. Install the door stopper (E), door rollers (H), fixed panel’s bracket (G) and the support bar anthors (D) onto the support bar (F). 6.3.
Page 20
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE 7.1-7.2. Place the fixed panel (C) into the wall track (B) and put back the sliding door guide (A). 7.3-7.4.
SHOWER DOOR INSTALLATION INSTALLATION DE LA PORTE DE DOUCHE INSTALACION DE LA PUERTA DE DUCHA 8.1-8.2. Install the door panel by its 2 rollers (H) on the support bar (F) and make sure to place the bottom of the door inside the guide (A). 8.3.
SEAL STRIPS INSTALLATION INSTALLATION DES BANDES D’ÉTANCHÉITÉ INSTALACIÓN DE LAS TIRAS DEL SELLO 9.1-9.2. Install the 2 glass panel vertical seal strips (P). Install the door vertical seal strip (I) on the closing end. For the door vertical seal strips, they should start right above the door bottom seal strip (O).
HANDLE INSTALLATION INSTALLATION DE LA POIGNÉE INSTALACIÓN DE LA MANIJA 10.1-10.2. Using silicone, install the decorative track (L) in front of the door panel. Slide the decorative caps (K) onto the track. 10.3-10.4. Secure the fixed panel (C) by drilling guide holes through the wall track (B) and screwing it in place using fittings (FF), screws (DD) and caps (EE). 10.5.
SEALING SCELLAGE SELLADO Ensure that the door closes tightly and opens smoothly. Ensure that there is a firm connection between the fixed panel(s) and the support bar. Apply a clear silicone water sealant around the outside perimeter of any fixed shower components. Allow 24 hours for silicone to dry. Improper application of silicone sealant may cause your shower to leak.
MAINTENANCE AND CARE ENTRETIEN ET MAINTENANCE MANTENIMIENTO Y CUIDADO For the daily maintenance, use a wet cloth and a soft liquid cleaner. Never use abrasive cleaners containing some acetone, chlorine or strong bleach, scrapers, metallic brushes, nor other objects or the products which can graze or tarnish surfaces.
LIMITED Product Warranty The DISTRIBUTOR is a distributor of the following Products: • Shower Doors (warranty period 5 years). • Acrylic Surfaces (warranty period 5 years against blistering, cracking or chipping in the acrylic surface). • Acrylic Shell Structure (warranty period 5 years against loss of water through fiberglass laminate of the acrylic body). •...
Page 27
Distributed by: Costco Wholesale Canada Ltd.* Importado por: Costco Wholesale Corporation 415 W. Hunt Club Road Importadora Primex S.A. de C.V. P.O. Box 34535 Ottawa, Ontario Blvd. Magnocentro No. 4 Seattle, WA 98124-1535 K2E 1C5, Canada San Fernando La Herradura 1-800-463-3783 Huixquilucan, Estado de México 1-800-774-2678...