COMMISSIONING/INITIAL PRODUCT START-UP
Connecting the Receiver/Tethered Remote
Insert the 3.5mm jack of the Bluetooth receiver into the socket at the back of the appliance (Fig. 12). It is important to
ensure that the jack is pushed fully into the socket. Failure to fully insert the jack will prevent the product from functioning
correctly. The receiver has a cable length of 1.4m which will allow you position it anywhere around the product. If you
prefer to hide it, the receiver can be placed inside the surround/wall. Please ensure that the receiver is not enclosed in
metal, concrete or any other dense material, this will affect the signal from the remote control.
Initial Product Start-up
In some cases, where low water pressure exists, the product may start to fill with water but not complete its first fill within
the allowed time period of 120 seconds. If this situation occurs, the product will start to flash four times 120 seconds
after first turning on the product. Reset the product by switching off the main switch and leaving it rest for 30 seconds.
Switch the main switch back on again and start the product using the power/standby button. The product will then be
able to complete its first fill. Please note, if no water is present in the sump, there may be an issue with the water supply
to the product. This error will be represented by the product flashing two times 90 seconds after first turning on the
product. Check all connections and ensure that there are no leaks. Also check that the leak prevention valve has not
been activated; see "Changing the Leak Prevention Valve Pad" paragraph below under "Maintenance".
Installing the Log Fuel Bed (If Supplied)
The product is supplied with a 'metal fuel bed' fitted. If you have chosen to operate your product with a log fuel bed,
remove this metal fuel bed and retain it for future use (Fig. 13). Follow the steps below to install the log fuel bed.
1. Gently lift the LED Log fuel bed out of its packaging. CAUTION: The fuel bed weighs 5kg. Be sure to only lift the fuel
bed by the two centre logs (Fig. 14).
2. Place the fuel bed on top of the appliance, there are 4 plastic guides under the fuel bed to help locate it (Fig.10).
Please note the fuel bed can be placed front to back or back to front on the product.
3. Once the fuel bed is in place, remove the small loose log (Fig 15). This small log is secured with magnets and should
easily lift off the fuel bed.
4. Locate the DC jack under the small log and connect it to the corresponding DC jack located on the product through
the hole in the fuel bed (Fig.16).
5. Each log fuel bed is supplied with a loose non LED log. For single CAS500 installations, this can be placed on top
of the fuel bed or stored away with the packaging. For CAS1000 or multiple product installations, the loose log can
be placed on the centre join between two fuel beds (Fig 17).
MULTIPLE PRODUCT INSTALLATION (DAISY CHAINING)
Power and Water Connections
Both the CAS500 and CAS1000 products can be installed side by side to elongate the flame effect. When supplying
power to multiple products, ensure the maximum wattage of the combined products does not exceed the rated capacity
of the MCB in the circuit. The water supply to multiple products should be constructed in a manifold style configuration
and sized appropriately for the number of units that are being installed so a consistent volume water and pressure is
being supplied to each unit.
Multiple Product Control
Each product can be paired with its own remote or multiple products can be paired a single remote. Please note a
maximum of six individual products (either CAS500 or CAS1000) can be connected to a single Bluetooth remote control.
This will allow for control of all products at once with a single remote control. Additionally, the software of the product has
been designed in such a way that when multiple products are connected to a main switch, products can be manually
switched off and when switched back on they will operate in the same state as before they were switched off.
Multiple Product Installation
Follow steps 1-4 in "Installing the Product into Surround/Enclosure" to fit the first product. It is important that the first
product is orientated so that the side of the product with the slots is left free and not connected to first end of the
installation (Fig 18).
1. When the first product is installed and securely fixed, prepare the second product by unscrewing the joining screws
(Fig 19A) and screwing them into the opposite side of the metalwork (Fig 19B). Please note, these screws should
not be fully tightened and 5-10mm of thread should be left protruding from the edge of the product.
2. Fit the second product beside the first product, ensuring the protruding screws of the second product engage with
slots of the first product. (Fig 20)
3. Ensure the second product is at the correct height to match the first product and ensure it is adequately level. This
can be done by adjusting the adjustable feet with a flat head screwdriver. (Fig 8) The levelness of the product can
be verified by checking the on-board level (Fig 9)
4. Tighten the screws of the second product so that it joins tightly with the first product.
Additional products can be fitted to the second product by following steps 1-4 above.