Ozone R1 V3 Manuel D'instructions page 15

Table des Matières

Publicité

pro-tune speeD sYstem
imPORtant nOtEs anD aDJUstmEnt instRUctiOns
the speed system and Bridle lines will require maintenance just like any high performance
equipment in racing sports - they must be checked after every 60 hours flying time, and maintained
in the correct trim or the kite will not perform as designed. Bridle Lines that are worn or not to factory
specification (+ or - 15mm) must be replaced. Speed System lines that are worn must be replaced.
If the Speed System lines are not worn, but are not to factory specifications (+ or - 15mm) you must
adjust back to factory spec.
DimEnsiOns:
Pa1
590
Pa2
460
PB1
980
PB2
530
PB3
200
PC1
540
The sheathed pulley lines (PB1 & PB2) will wear over time and will need to be replaced. Make sure
you check them before every session. You'll find spare pulley lines in the supplied repair kit. If the
Speed System lines have shrunk or stretched drastically they might be damaged. Make sure you
check every single speed system line to their specs and if necessary replace them.

Publicité

Table des Matières
loading

Table des Matières