INSTALLATION
Plumbing Requirements
Plumbing Schematics – Flow 30 to 70-GPM
(continued)
M
H
P
I
ULTIPLE
EAT
UMP
NSTALLATION
H
P
G
H
B
U
EAT
UMP WITH
AS
EATER
ACK
P
M
30 GPM
E
H
INIMUM
TO
ACH
EATER
M
S
24-I
INIUM
PACING
NCHES
Water IN & OUT Connections- Typical
(exact location varies by model)
For proper operation and maximum efficiency, piping coming from the pump and filter MUST be con-
nected to the "IN" port of the heater. Likewise, connect piping returning to the pool/spa to the "OUT"
port of the heater. See drawing below.
PLUMBING CONNECTION DETAIL
From Pump/Filter
Return to Pool/Spa
42