Heating Priority Wiring For Monophasic Pump - Hayward ENERGYLINE PRO INVERTER ENPI4M Manuel D'instructions Et D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 4
6. APPENDIX (continued)

6.2 Heating priority wiring for monophasic pump

Dry contact 16 A max
K2
Power supply
230V
/ 50Hz
Monophasic pump
Terminals 1 and 2 deliver a potential-free dry contact,
230V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Energyline pro inverter enpi6m

Table des Matières