Door Removal - Middle Atlantic Products FlexView FVS IFP Serie Manuel D'instructions

Table des Matières

Publicité

FLAT PANEL INSTALLATION (CONTINUED)
4. Once display installation is complete, use level adjustment screws on top of display mount brackets
to level display. (FIGURE H)
5. For security, a lock (not supplied) can be attached to security holes on both display mount brackets.
Bracket
Security Holes

DOOR REMOVAL

1. Unlock top door panel and tilt and lift off to
expose rear of unit for cable management.
(FIGURE J)
NOTE: Upper compartment access is intended
for setup and cable management access. It is
not intended for storage.
2. Pull latch on bottom door panel, tilt and lift
off to expose rear component and storage
compartment. (FIGURE J)
3. To reinstall, hook the bottom of each door
panel and lock the top (or latch the bottom)
door panel in place. For equipment security,
bottom door panel can also be locked.
Leveling Screws
FIGURE H
Page 13
FIGURE J

Publicité

Table des Matières
loading

Table des Matières