Owner's manual
Step 5: Positioning of the two adjusting brackets
Move the sliding bracket along the heater so it is well positioned to
connect to the ceiling-mounted bracket. Ensure that the brackets are
locked tight by the butterfly hand screws.
2.6. Commissioning checklist before operating
Please use the following checklist for commissioning the heater:
1. Do not turn on power before all installation work has been
finished.
2. Verify that all wire connections are correct and firmly fixed.
3. Any scattered object – like wire insulation, screws etc. – should be
removed from the heater body.
4. After connecting the power and switching it on for the first time,
observe that the heater starts working.
IH-xxxx-D series infrared heater
Page 15 / 198
Version 1.3