EN
5.7.2
Wall mounting
Verify that the enclosed dowels are suitable for the intended wall.
8. Screw the pipes of the heating circuit to the screw connections of the
product.
9. Refit the upper shell of the heat insulation to the product (see "Heat insu-
lation" on page 8).
5.7.3
Mounting the temperature probe (optional)
24
PrimoTherm®
Mounting
A
B
A
B
1. Verify that the wall can carry the
product.
2. Remove the upper parts of the
heat insulation.
3. Hold the product to the wall and
align it with a level.
4. Draw six marks.
5. Interconnect the opposing marks.
6. Drill holes (Ø 10 mm) at the inter-
sections (B).
7. Mount the product using the
enclosed dowels and screws (A).
- long hanger bolt at the top
- short hanger bolt at the bottom
Depending on the type of the
temperature probe (B), it may
be necessary to shorten the
ferrule (A).