Installation
A
E
(fig. 1)
-Remove the connections cover (D).
-Separate the front (B) from the box (A).
-Choose the most suitable cable entry for the facility (fig. 3).
-Make the holes for the glands using the pre-drilled centres as a guide.
-Drill 3 holes on the wall following the box fixing holes (E) (fig. 4).
-Insert and tighten the 3 screws + plug (F).
-Insert the cables through the glands. Use the passing area shown in figure 3 for cable
guiding.
-Connect the battery (See page 15)
-Connect the power supply inlet to the circuit breaker as indicated in figure 2.
-Assemble the front on the box (B) carefully making sure that the cables are not
pinched.
-Insert and tighten the two screws on the front (G).
-Connect the cables following the diagrams in Wiring section.
-Close the connections cover (D), insert and tighten the fixing screws (H).
(fig. 3)
F
G
140
(fig. 4)
B
M
(fig. 2)
140
C
D
H
POWER SUPPLY INPUT
230Vac +10% -15%
50/60Hz ±3Hz
L
N
CONNECT ALL EARTH
CONNECTIONS IN
THIS TERMINAL