Publicité

Liens rapides

15' x 8'
OUTDOOR STORAGE SHED
MODEL 6446
BEFORE ASSEMBLY:
• Assemble on a level surface
• At least 3 people recommended for setup
ADDITIONAL ASSEMBLY HELP
For Customer Service in mainland Europe:
E-mail: cs@lifetimeproducts.eu
TOOLS REQUIRED
QUESTIONS?
CONTACT LIFETIME CUSTOMER SERVICE:
Call: 1-800-225-3865
7:00 am–5:00 pm (Monday–Friday) MST
and 9:00 am–1:00 pm Saturday MST
For assembly help, scan:
or search
1156037
in the BILT app.
Live Chat: www.lifetime.com/customerservice
(click on "LIVE CHAT" tab)
ASSEMBLY INSTRUCTIONS
Pour le français, voir la page 2. Para el español, ver la página 3.
5/16" (8 mm)
Wood Drill Bit
5/16" (8 mm)
Masonry Drill Bit
MODEL# AND PRODUCT ID
Model Number: 6446
Product ID:
TABLE OF CONTENTS
Icon Legend................................4
Warnings & Notices.....................5
Platform Construction.................6
Truss Assembly.........................11
Gable Assembly........................18
Door Assembly..........................22
Floor Assembly..........................31
Wall Assembly..........................35
Shelving Installation..................42
Parts Identifi er..........................45
Roof Assembly..........................50
Shutter Installation...................69
Window Installation...................73
Pegboard Installation.................76
Door Alignment.........................79
Anchoring................................81
Cleaning & Care.........................87
Registration...........................88
Warranty................................89
(you will need both when contacting us)

Publicité

Table des Matières
loading

Sommaire des Matières pour Lifetime 6446

  • Page 1 5/16" (8 mm) Anchoring........81 Masonry Drill Bit Cleaning & Care......87 Registration......88 Warranty........89 QUESTIONS? CONTACT LIFETIME CUSTOMER SERVICE: Live Chat: www.lifetime.com/customerservice MODEL# AND PRODUCT ID Call: 1-800-225-3865 (you will need both when contacting us) (click on “LIVE CHAT” tab) Model Number: 6446 7:00 am–5:00 pm (Monday–Friday) MST...
  • Page 2: Instructions D'assemblage

    Nettoyage et entretien....87 Enregistrement......88 Garantie.......90 ® QUESTIONS ? CONTACTER AUX SERVICES À LA CLIENTÈLE LIFETIME t’Chat en direct: www.lifetime.com/customerservice N° DE MODÈLE ET RÉFÉRENCE DU PRODUIT Composer le 1-800-225-3865 (il faut avoir les deux au moment de nous contacter) (cliquer sur la languette « LIVE CHAT ») N°...
  • Page 3: Table Des Matières

    Limpieza y cuidado.....87 Registro........88 Garantía.......91 ® ¿PREGUNTAS? PONERSE EN CONTACTO CON LOS SERVICIOS DE CLIENTES LIFETIME Chat en vivo: www.lifetime.com/customerservice MODEL E ID DEL PRODUCTO Marcar : 1-800-225-3865 (se necesitan los dos al contactarnos) (cliquear en la lengüeta «LIVE CHAT») Número de modelo: 6446...
  • Page 4: Leyenda De Íconos

    ICON LEGEND / LÉGENDE DES ICÔNES / LEYENDA DE ÍCONOS • Indicates special heed should be taken when reading. • Indique qu’une attention spéciale doit être portée à la lecture. • Indica que uno debe prestar atención al leer. • Indicates the parts to be used for a section. •...
  • Page 5: Advertencias Y Avisos

    WARNINGS & NOTICES / AVERTISSEMENTS ET AVIS / ADVERTENCIAS Y AVISOS English: • Failure to follow these warnings may result in serious injury or property damage and will void warranty. • To ensure safety, do not attempt to assemble this product without following the instructions carefully. •...
  • Page 6: Ensamble De La Plataforma

    PLATFORM CONSTRUCTION / CONSTRUCTION DE LA PLATE-FORME / CONSTRUCCIÓN DE LA PLATAFORMA • You must provide a platform on which to assemble your shed. Proper building permit documentation may be required in your neighborhood. Consult all local building codes prior to assembling the shed. Before beginning assembly, you must pour or construct a platform.
  • Page 7 SECTION 1 (CONTINUED) / SECTION 1 (SUITE) SECCIÓN 1 (CONTINUACIÓN) CONCRETE REQUIRED / BÉTON REQUIS CONCRETO REQUERIDO 2 yd (1,53 m CONCRETE PLATFORM / PLATE-FORME EN BÉTON PLATAFORMA DE CONCRETO • The concrete should be approximately 4" (10,2 cm) thick. The actual dimensions of the shed, at its widest and longest points, are 180"...
  • Page 8 SECTION 1 (CONTINUED) / SECTION 1 (SUITE) SECCIÓN 1 (CONTINUACIÓN) WOOD REQUIRED / BOIS REQUIS MADERA REQUERIDA WOOD PLATFORM / PLATE-FORME EN BOIS PLATAFORMA DE MADERA • The actual dimensions of the shed, at its widest and longest points, are 180" x 96" (4,57 m x 2,44 m). Ensure you select a site that will accommodate these measurements.
  • Page 9 SECTION 1 (CONTINUED) / SECTION 1 (SUITE) SECCIÓN 1 (CONTINUACIÓN) WOOD REQUIRED / BOIS REQUIS MADERA REQUERIDA 2 in/po x 4 in/po x 178 in/po (5,1 cm x 10,2 cm x 4,52 m) (x2) 2 in/po x 4 in/po x 90 1/2 in/po (5,1 cm x 10,2 cm x 2,30 m) (x12) 16d 3 in/po (16d x 7,62 cm) (x52) 1.2.1 •...
  • Page 10 SECTION 1 (CONTINUED) / SECTION 1 (SUITE) SECCIÓN 1 (CONTINUACIÓN) WOOD REQUIRED / BOIS REQUIS MADERA REQUERIDA 34 in/po x 93 1/2 in/po x 3/4 in/po (86,4 cm x 2,38 m x 19,1 mm) (x1) 48 in/po x 93 1/2 in/po x 3/4 in/po (1,22 m x 2,38 m x 19,1 mm) (x3) 3/8 in/po (10 mm) 8d 1 1/2 in/po (8d 3,81 cm) (x72)
  • Page 11: Ensamble De Las Cerchas

    TRUSS ASSEMBLY / ASSEMBLAGE DES FERMES / ENSAMBLE DE LAS CERCHAS HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje CXK (x2) DTK (x22) ADY (x19) ADK (x40) ADJ (10) AHT (x1) DTJ (x1) 11 9/16 in/po (29,4 cm) ADH (x5)
  • Page 12 SECTION 2 (CONTINUED) / SECTION 2 (SUITE) SECCIÓN 2 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (x2) (10 mm) (x2) ADK (x8) DTK (x8) SIDE TRUSSES (x2) / FERMES LATÉRALES (x2) CERCHAS LATERALES (x2) •...
  • Page 13 SECTION 2 (CONTINUED) / SECTION 2 (SUITE) SECCIÓN 2 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (10 mm) ADY (x8) ADK (x8) 7/16 in/po (x2) (11 mm) (x2) 11 9/16 in/po (29,4 cm) ADH (x2) ADJ (x4) ADY (x2)
  • Page 14 SECTION 2 (CONTINUED) / SECTION 2 (SUITE) SECCIÓN 2 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADJ (x4) 7/16 in/po (x2) (11 mm) (x2) DTK (x8) 3/8 in/po (x2) (10 mm) (x2) ADY (x8) 11 9/16 in/po (29,4 cm) ADK (x16) ADH (x2)
  • Page 15 SECTION 2 (CONTINUED) / SECTION 2 (SUITE) SECCIÓN 2 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (x2) (10 mm) (x2) DTK (x4) ADK (x6) ADY (x2) DTK (x4) • Attach a Connector (AIP) to the end of two Truss Gutter Channels using the hardware provided.
  • Page 16 SECTION 2 (CONTINUED) / SECTION 2 (SUITE) SECCIÓN 2 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (x2) (10 mm) (x2) DTK (x2) ADK (x1) DTJ (x1) CXK (x2) 2.11 • Attach the Vertical Truss Brace (DSN) to the Truss. Only fi nger tighten this Nut (ADK) for now. •...
  • Page 17 SECTION 2 (CONTINUED) / SECTION 2 (SUITE) SECCIÓN 2 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 7/16 in/po (x2) (11 mm) (x2) ADJ (x2) 3/8 in/po (x2) AHT (x1) (10 mm) (x2) 11 9/16 in/po (29,4 cm) ADH (x1) ADK (x1) ADY (x1)
  • Page 18: Ensamble De Las Fachadas

    GABLE ASSEMBLY / ASSEMBLAGE DES PIGNONS / ENSAMBLE DE LAS FACHADAS HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje ADW (x10) ADZ (x8) AEE (x10) AGP (x2) AIQ (x2) ADV (x4) AHS (x2) PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Metal Parts /...
  • Page 19 (AGH) y derecha (AGI). código debajo para ver un video sobre el ensamble en esta sección. http://go.lifetime.com/gableassem10x8 • Place the Screen (AIQ) over the Vent (AGP), and align • Secure the two Gable Halves with four (4) Screws the fi ve holes in the Vent with those in the Gable.
  • Page 20 SECTION 3 (CONTINUED) / SECTION 3 (SUITE) SECCIÓN 3 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AEE (x10) ADW (x10) AHS (x2) • Repeat the previous steps for the second Vent. • Secure with the hardware included. •...
  • Page 21 SECTION 3 (CONTINUED) / SECTION 3 (SUITE) SECCIÓN 3 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADV (x4) • Align the holes in the Header with those in the Entry Gable. Secure with the hardware included. •...
  • Page 22: Ensamable De Las Puertas

    LEFT DOOR ASSEMBLY / ASSEMBLAGE DE LA PORTE GAUCHE / ENSAMBLE DE LA PUERTA IZQUIERDA HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje AEE (x3) ADW (x3) ADJ (x2) ABU (x2) DZG (x1) AHZ (x1) AHM (x2)
  • Page 23 • Si tiene problemas con esta sección, siga el código debajo para ver un video sobre el ensamble en esta sección. http://go.lifetime.com/leftdoor8foot • Note: Door Channels (BLH) are bowed by design, ensuring a tight fi t when they are closed and latched, making your shed more secure. These channels are formed with a slight bend to the adjoining door edge—like parentheses facing each other: ( ).
  • Page 24 SECTION 4 (CONTINUED) / SECTION 4 (SUITE) SECCIÓN 4 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AHM (x2) DZG (x1) • Set the Deadbolts (AHM) down into the recesses at the top and bottom of the Door. Then, slide the Door End Channel (BLH) over the edge of the Door and the bottom of the Deadbolts as shown.
  • Page 25 SECTION 4 (CONTINUED) / SECTION 4 (SUITE) SECCIÓN 4 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 7/16 in/po (11 mm) ADW (x3) ADJ (x2) ABU (x2) AHZ (x1) AIA (x1) AEE (x3) • Attach the Door Latch (AIA) to the Door using the hardware included. Do not overtighten. •...
  • Page 26 RIGHT DOOR ASSEMBLY / ASSEMBLAGE DE LA PORTE DROITE / ENSAMBLE DE LA PUERTA DERECHA HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje ADB (x2) AEE (x5) AEB (x2) AAB (x2) AHY (x1) ADW (x4) ABV (x2)
  • Page 27 • Si tiene problemas con esta sección, siga el código debajo para ver un video sobre el ensamble en esta sección. http://go.lifetime.com/rightdoor8ft • Note: Door Channels (BLH) are bowed by design, ensuring a tight fi t when they are closed and latched, making your shed more secure. These channels are formed with a slight bend to the adjoining door edge—like parentheses facing each other: ( ).
  • Page 28 SECTION 5 (CONTINUED) / SECTION 5 (SUITE) SECCIÓN 5 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIK (x1) AEE (x3) ADW (x3) AIO (x1) • Slide the Door End Channel (BLH) over the edge of •...
  • Page 29 SECTION 5 (CONTINUED) / SECTION 5 (SUITE) SECCIÓN 5 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 7/16 in/po (11 mm) AIL (x1) ABV (x2) AEB (x2) AHV (x1) AHX (x1) AAB (x2) ADB (x2) •...
  • Page 30 SECTION 5 (CONTINUED) / SECTION 5 (SUITE) SECCIÓN 5 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AHY (x1) AHW (x1) ADW (x1) • Attach the Bracket (AHW) using a Screw (ADW), and attach the Spring (AHY).
  • Page 31: Ensamble Del Piso

    FLOOR ASSEMBLY / ASSEMBLAGE DU PLANCHER / ENSAMBLE DEL PISO HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje ADC (x1) AHO (x2) BQC (x30) Note: These are not anchoring screws. Their purpose is to fasten together the Floor Panels. Remarque : Ces vis ne sont pas de vis d’ancrage.
  • Page 32 SECTION 6 (CONTINUED) / SECTION 6 (SUITE) SECCIÓN 6 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS • Hold an Inner Floor Panel (CUD) at an angle and slide the tabs along the edge underneath an Outer Floor Panel (CUW).
  • Page 33 SECTION 6 (CONTINUED) / SECTION 6 (SUITE) SECCIÓN 6 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AHO (x2) • Repeat the last step. • Attach an Outer Floor Panel (CUW) to the Inner Floor •...
  • Page 34 SECTION 6 (CONTINUED) / SECTION 6 (SUITE) SECCIÓN 6 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS BQC (x30) • Insert the Screws (BQC) through the divots in the Floor Panels and into the tabs of the adjacent Floor Panels. (The divots are near the seams of the Floor Panels.) •...
  • Page 35: Ensamble De Los Muros

    WALL ASSEMBLY / ASSEMBLAGE DES MURS / ENSAMBLE DE LOS MUROS HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje ADZ (x90) PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Metal Parts / Pièces en métal Piezas de metal 67 3/4 in/po (1,72 m)
  • Page 36 SECTION 7 (CONTINUED) / SECTION 7 (SUITE) SECCIÓN 7 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIW (x1) ADZ (x5) • Insert tabs at the bottom of the Right Half-Wall • Slide the Panel to the left. Panel (CKN) into the seventh and eighth slots from •...
  • Page 37 SECTION 7 (CONTINUED) / SECTION 7 (SUITE) SECCIÓN 7 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIW (x1) ADZ (x5) • Insert tabs at the bottom of the Corner Panel (AGW) into the fi rst two slots along the right edge of the Floor.
  • Page 38 SECTION 7 (CONTINUED) / SECTION 7 (SUITE) SECCIÓN 7 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIW (x1) ADZ (x45) • For the right, rear Corner Panel (AGL), repeat the • Insert two Wall Panels (AHD) along the right edge of the Floor one at a time.
  • Page 39 SECTION 7 (CONTINUED) / SECTION 7 (SUITE) SECCIÓN 7 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIW (x1) ADZ (x25) 7.10 7.11 • Insert Wall Panels (AHD) along the left side of the •...
  • Page 40 SECTION 7 (CONTINUED) / SECTION 7 (SUITE) SECCIÓN 7 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x4) 7.14 • Four (4) Screws (ADZ) are used to attach the Channel (AFM). • Quatre (4) vis (ADZ) servent pour attacher le support (AFM) au panneau mural. •...
  • Page 41 SECTION 7 (CONTINUED) / SECTION 7 (SUITE) SECCIÓN 7 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x4) 7.15 • Four (4) Screws (ADZ) are used to attach the Channel (AFM) to the Wall Panel. •...
  • Page 42: Instalación De La Estantería

    SHELVING INSTALLATION / INSTALLATION DU RAYONNAGE / INSTALACIÓN DE LA ESTANTERÍA HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje AIY (x4) ADZ (x28) ADZ (x16) PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Metal Parts / Pièces en métal Piezas de metal...
  • Page 43 El canal de soporte para la pared izquierdo se sujeta dentro de la ranura a la derecha de la muesca en el panel de pared. http://go.lifetime.com/90shelf • Top End • Extrémité suprieure • Extremo superior...
  • Page 44 SECTION 8 (CONTINUED) / SECTION 8 (SUITE) SECCIÓN 8 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x6) • Insert the Shelf Brackets (AIY) into the slots in the Wall/Shelf Support Channels. The Brackets must be at the same height. •...
  • Page 45: Identifi Cador De Piezas

    PARTS IDENTIFIER / IDENTIFICATEUR DE PIÈCES / IDENTIFICADOR DE PIEZAS CONTENTS OF BOX 1 / CONTENU DE LA BOÎTE 1 CONTENIDO DE LA CAJA 1 BDK (x1) BDJ (x1) AGH (x2) AGI (x2) BDC (x1) CUW (x2) AFY (x3) AGQ (x6) CUD (x2) DRA (x1) BDR (x1)
  • Page 46 PARTS IDENTIFIER / IDENTIFICATEUR DE PIÈCES / IDENTIFICADOR DE PIEZAS METAL PARTS KIT 1 / KIT PIÈCES EN MÉTAL 1 KIT DE PIEZAS DE METAL 1 34 1/8 in/po (86,7 cm) DSO (x1) 74 1/2 in/po (1,89 m) CRE (x2) 75 1/2 in/po (1,92 m) BLH (x2) 58 1/4 in/po (1,47 m)
  • Page 47 PARTS IDENTIFIER / IDENTIFICATEUR DE PIÈCES / IDENTIFICADOR DE PIEZAS CONTENTS OF BOX 2 / CONTENU DE LA BOÎTE 2 CONTENIDO DE LA CAJA 2 AHH (x2) AGW (x2) AGL (x2) AHD (x5) CKK (x1) CKN (x1) CONTENTS OF SMALL PARTS BOX / CONTENU DE LA BOÎTE DE PETITES PIÈCES CONTENIDO DE LA CAJA DE PIEZAS PEQUEÑAS AYI (x4)
  • Page 48 PARTS IDENTIFIER / IDENTIFICATEUR DE PIÈCES / IDENTIFICADOR DE PIEZAS CONTENTS OF BOX 2 / CONTENU DE LA BOÎTE 2 CONTENIDO DE LA CAJA 2 HARDWARE BAGS / SACS DE QUINCAILLERIE BOLSAS DE HERRAJE CONTENTS OF BOX 3 / CONTENU DE LA BOÎTE 3 CONTENIDO DE LA CAJA 3 AHD (x4) CUD (x2)
  • Page 49 SECTION 8 (CONTINUED) / SECTION 8 (SUITE) SECCIÓN 8 (CONTINUACIÓN) TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x16) • Select the corner in which you would like to install a Corner Shelf (AFZ). Fold up the fl aps of the Shelf, and align the holes in the tabs with those in the Corner Wall Panel.
  • Page 50: Ensamble Del Tejado

    ROOF ASSEMBLY / ASSEMBLAGE DU TOIT / ENSAMBLE DEL TEJADO HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje BHJ (x2) ADX (x36) DTV (x2) ADZ (x200) AED (x36) AXX (x4) AHP (x2) AEE (x2) CXK (x2) BZA (x2)
  • Page 51 ROOF ASSEMBLY / ASSEMBLAGE DU TOIT / ENSAMBLE DEL TEJADO PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Plastic Parts / Pièces en plastique Piezas de plástico (x1) (x2) BDK (x1) BDJ (x1) BDR (x1) BDS (x1) DRA (x1) AGQ (x10) AFY (x5) AHC (x6) DRB (x1)
  • Page 52 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x14) • Attach a Side Gable to the Shed using fourteen (14) Screws (ADZ). • Attacher un pignon latéral à l’abri à l’aide de quatorze (14) vis (ADZ). •...
  • Page 53 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x4) • Set the Roof Panel (AGQ) down onto the Wall Panel, Gable, and Truss. The groove at the bottom of the Roof Panel sets over the top of the Wall Panel.
  • Page 54 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x7) • Insert the fi rst three (3) Screws (ADZ) through the Gable and the fi rst two (2) Screws (ADZ) through the Truss and into the Roof Panel at the locations shown.
  • Page 55 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x11) • Repeat these steps for the rear Roof Panel, but only use one Roof Support for each Roof Panel (AGQ). •...
  • Page 56 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x20) • Attach these Roof Panels (AGQ) in a similar manner as the previous Panels. Roof Panels in these locations only use ten (10) Screws (ADZ) each.
  • Page 57 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x42) 9.10 • Repeat steps 9.1–9.6 & 9.9–9.10 for the Panels on the opposite side. • Répéter les étapes 9.1 – 9.6 et 9.9 – 9.10 pour les panneaux sur le côté opposé. •...
  • Page 58 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 9.11 • Place the back of the Center Truss into the notch on the center rear Wall Panel. Then, lift the front of the Truss up so the ends of the Roof Support Tube touch the Side Trusses.
  • Page 59 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (10 mm) DTV (x2) AEE (x2) CXK (x2) 9.12 • Secure the ends of the Support Tube to the Side Truss Channels using the hardware included. •...
  • Page 60 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AHP (x1) 9.13 • Pull the Hinge Tube down out of the Left Door (the Door without the notched corner) about six inches. Align the hole at the bottom of the Hinge Tube with the slit in the Bushing, and insert the Tube.
  • Page 61 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AHP (x1) 9.14 • Repeat the last step for the Right Door. • Répéter l’étape précédente pour la porte droite. •...
  • Page 62 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x21) 9.16 • Set the end of the Center Truss onto the notch in the Front Gable as shown. •...
  • Page 63 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (10 mm) ECS (x1) BZA (x2) ADK (x2) AEE (x4) ECR (x1) 9.18 • Insert the Right Drainage Plate (ECS) into the Right Lateral Truss, and align the notch in the Plate with the fi rst hole in the Truss as shown.
  • Page 64 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS 3/8 in/po (10 mm) ADZ (x14) 9.20 • Fold the ends of the Large Angled Roof Panel (DRA) and set it down onto the shed as shown. Secure the Panel to the Entry Gable and Center Truss with twelve (12) Screws (ADZ) at the locations shown.
  • Page 65 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x20) 9.22 • An adult must apply a downward pressure on Panel (DRB) while another inserts these Screws (ADZ). •...
  • Page 66 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS BHJ (x2) 9.24 • Use an electric screwdriver to Insert a Self Tapping Screw (BHJ) through the plastic of the Gable and into the Right and Left Door Hinge Tubes at the location indicated.
  • Page 67 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x40) 9.25 • Starting at the right, attach the Roof Caps to the shed using the hardware included. •...
  • Page 68 SECTION 9 (CONTINUED) / SECTION 9 (SUITE) SECCIÓN 9 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADX (x36) AED (x36) AXX (x4) 9.26 • Fold the Skylights (AHC), and attach them to the Roof using six (6) Screws (ADX) and Washers (AED) for each Skylight.
  • Page 69 SHUTTER INSTALLATION / INSTALLATION DES VOLETS / INSTALACIÓN DE LAS CONTRAVENTANAS HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje ARV (x16) PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Plastic Parts / Pièces en plastique Piezas de plástico AYI (x4)
  • Page 70 SECTION 10 (CONTINUED) / SECTION 10 (SUITE) SECCIÓN 10 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ARV (x1) 10.1 • There are four sets of two screw location indicators. The measurements are shown to help you locate them. One by one, insert the Screws (ARV) through the indicators from the inside of the shed outward, and attach the Shutters (AYI) to the outside of the Wall Panels.
  • Page 71 SECTION 10 (CONTINUED) / SECTION 10 (SUITE) SECCIÓN 10 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ARV (x7) 10.2 • Align the screw bosses in the Shutters (AYI) with the holes in the Wall Panels. Secure the Shutters to the Panels using the Screws (ARV) included.
  • Page 72 SECTION 10 (CONTINUED) / SECTION 10 (SUITE) SECCIÓN 10 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ARV (x8) 10.3 • Align the screw bosses in the Shutters (AYI) for the left side of the Window with the holes in the Wall Panels. Secure the Shutters to the Paneles using the Screws (ARV) included.
  • Page 73: Instalación De Los Contrachapados.69 Instalación De La Hoja

    WINDOW PANE INSTALLATION / INSTALLATION DES CARREAUX / INSTALACIÓN DE LAS HOJAS DE VENTANA HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje ADY (x2) ADZ (x8) AIS (x4) PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Plastic Parts / Pièces en plastique Piezas de plástico...
  • Page 74 11.2 • Insert a Screw (ADY) into the hole at the bottom of the Window Pane. This helps keep the Window Pane up when open.
  • Page 75 SECTION 11 (CONTINUED) / SECTION 11 (SUITE) SECCIÓN 11 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS ADZ (x4) AIS (x2) 11.3 • Attach the two (2) Window Latches (ADY) at the top corners of the Panel opening. The Latch should move freely. •...
  • Page 76: Instalación Del Organizador

    PEGBOARD STRIP INSTALLATION / INSTALLATION DE L’ORGANISEUR D’OUTILS / INSTALACIÓN DEL ORGANIZADOR DE HERRAMIENTAS HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO Hardware Bag / Sac de quincaillerie Bolsa de herraje AIJ (x2) ADW (x10) AIG (x1) AIH (x3) AIF (x1) AII (x3) PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Plastic Parts /...
  • Page 77 • Sujetar el organizador de herramientas (AFU) a un sección. panel de pared usando cinco (5) tornillos (ADW). Evitar los paneles con ventana. http://go.lifetime.com/pegboard ADW (x5)
  • Page 78 SECTION 12 (CONTINUED) / SECTION 12 (SUITE) SECCIÓN 12 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIG (x1) AIF (x1) AIH (x3) AII (x3) AIJ (x2) 12.2 • Insert the various Hooks (AIF, AIG, AIH, AII, AIJ) as shown. •...
  • Page 79: Alineamiento De Las Puertas

    DOOR ALIGNMENT / ALIGNEMENT DES PORTES / ALINEACIÓN DE LAS PUERTAS HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO NO HARDWARE REQUIRED FOR THIS SECTION AUCUNE QUINCAILLERIE REQUISE POUR CETTE SECTION NINGÚN HERRAJE REQUERIDO PARA ESTA SECCIÓN PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS Plastic Parts / Pièces en plastique Piezas de plástico...
  • Page 80 SECTION 13 (CONTINUED) / SECTION 13 (SUITE) SECCIÓN 13 (CONTINUACIÓN) TOOLS AND PARTS REQUIRED / OUTILS ET PIÈCES REQUIS INSTRUMENTAL Y HERRAJE REQUERIDOS AIX (x4) 13.1 • If one or both of the Doors scrape the fl oor when closing or are not aligned at the top, follow these steps to correct them: •...
  • Page 81: Anclaje De La Caseta

    SHED ANCHORING / ANCRAGE DE L’ABRI / ANCLAJE DE LA CASETA HARDWARE REQUIRED / QUINCAILLERIE REQUISE / HERRAJE REQUERIDO NO NEW HARDWARE OR PARTS INCLUDED FOR THIS SECTION AUCUNE NOUVELLE QUINCAILLERIE OU PIÈCE INCLUSE POUR CETTE SECTION NINGÚN HERRAJE NUEVO O PIEZA INCLUIDO PARA ESTA SECCIÓN PARTS REQUIRED / PIÈCES REQUISES / PIEZAS REQUERIDAS NO NEW HARDWARE OR PARTS INCLUDED FOR THIS SECTION AUCUNE NOUVELLE QUINCAILLERIE OU PIÈCE INCLUSE POUR CETTE SECTION...
  • Page 82 SECTION 14 (CONTINUED) / SECTION 14 (SUITE) SECCIÓN 14 (CONTINUACIÓN) FOR A CONCRETE PLATFORM / POUR UNE PLATE-FORME EN BÉTON PARA UNA PLATAFORMA DE CONCRETO 5/16 in/po (8 mm) 14.1 • If you plan on anchoring your shed to a concrete platform, you must purchase the correct anchoring hardware. We recommend using a hammer drill, 5/16"...
  • Page 83 SECTION 14 (CONTINUED) / SECTION 14 (SUITE) SECCIÓN 14 (CONTINUACIÓN) FOR A CONCRETE PLATFORM / POUR UNE PLATE-FORME EN BÉTON PARA UNA PLATAFORMA DE CONCRETO 5/16 in/po (8 mm) 7/16 in/po (11 mm) 14.1 • If you plan on anchoring your shed to a wood platform, you must purchase the correct anchoring hardware. We recommend using a drill, 5/16"...
  • Page 84 NOTES / REMARQUES / NOTAS 84 84...
  • Page 85 NOTES / REMARQUES / NOTAS 85 85...
  • Page 86 NOTES / REMARQUES / NOTAS 86 86...
  • Page 87: Nettoyage Et Entretien

    Congratulations on your Lifetime ® product purchase. By following the instructions below, your new Lifetime product should provide you with years of service and enjoyment. The polyethylene panels are stain and solvent resistant. Most stains can be removed using a mild soap and a soft-bristled brush.
  • Page 88: Registro

    REGISTER today! ENREGISTRER CE PRODUIT EN LIGNE À WWW.LIFETIME.COM Chez Lifetime®, nous nous engageons à fournir des produits innovateurs de qualité. Lors de votre inscription, vous aurez l’occasion de nous faire parvenir vos commentaires. Votre opinion est importante pour nous.
  • Page 89 All merchandise is sold on this condition, and no representative of the company may waive or change this policy. 5. This product is not intended for institutional or commercial use; Lifetime Products, Inc. does not assume any liability for such use. Institutional or commercial use will void the warranty.
  • Page 90: Garantie De Fabrication Limitée De 10 Ans

    2. Cette garantie n’est pas transférable et est expressément limitée à la réparation ou au remplacement du produit défectueux. © Si le produit est déclaré défectueux selon les termes de cette garantie, Lifetime Products, Inc. réparera ou remplacera les parties défectueuses gratuitement pour l’acheteur. Les frais d’expédition aller et retour de l’usine ne sont pas couverts et sont à...
  • Page 91: Garantía

    NO ESTÁN DISPONIBLES O SON OBSOLETAS. 1. El comprador original recibe la garantía de que las casetas Lifetime estarán libres de defectos de material o de mano de obra por un período de 10 años a contar desde la fecha de la compra original. La palabra “defectos” se defi ne como imperfecciones que perjudican el uso del producto.
  • Page 92 ® AMÉLIORER VOTRE ACHAT LIFETIME EN AJOUTANT DES ACCESSOIRES OU DES AUTRES PRODUITS ® Pour acheter des accessoires ou des autres produits Lifetime , rendre-nous visite à : www.lifetime.com Ou composer au 1-800-424-3865 Du lundi au vendredi 7 h – 17 h (HNR) et samedi 9 h – 13 h (HNR) ®...

Table des Matières