C24EO SERIES STEAMER
ELECTRICAL DATA
Model
Volts KW
C24EO3
208
8
240
8
C24EO5
208
12
240
12
480
12
SERVICE CONNECTIONS
Water Connections
No water supply connections are required, as
the steamer is fi lled manually.
Water Treatment
A local water treatment specialist should be
consulted before installation of steam generating
equipment.
Hardness*
Silica
Total Chlorine
PH
Undissolved Solids
*17.1 ppm = 1 grain of hardness
If the water supply fails to meet these standards,
it will be necessary to install a water conditioner.
The use of strainers or fi lters will not remove
minerals from the water.
Water Requirements
Proper water quality can improve the taste
of the food prepared in the steamer, reduce
liming in the steam generator and extend
Amp @
Amp @
1PH
3 PH
38.5
22.2
33.3
19.2
57.7
33.3
50.0
28.9
N/A
14.4
No more than 3 grains
less than 13 ppm
less than 4.0 ppm
range 6.5 to 8
less than 5 microns
equipment life. Water conditions vary from one
location to another. Ask your municipal water
supplier for details about your local water supply
prior to installation. Presence of sediment, silica,
excess chlorides or other dissolved solids may
lead to a recommendation for alternate form(s)
of water treatment. Test the water with the test
strip included with the steamer. Other factors
affecting steam generation are iron content,
amount of chloridation and dissolved gases.
Drain Connection
The C24EO can be confi gured to drain through
either the rear panel or through the bottom base
plate.
The unit is confi gured to be drained through the
rear panel from the factory. The unit is supplied
with a 12" length of
insuffi cient, remove the hose and install a new
hose ordered to the desired length. The factory
/
" ID silicone hose part number is 557475. Hose
5
8
is sold by the foot.
See Figure 3.
Figure 3: Rear Panel Drain Connection
(Viewed with right side panel removed)
To fi eld confi gure the drain through the bottom
base plate, the 4" leg kit (part number 843889) is
required. Also required are a
nipple (1
/
" long) and a
1
8
are available through local home improvement
or plumbing supply houses.
1. Remove right side panel.
2. Remove hose barb from drain.
3. Remove knockout from base plate.
— 8 —
/
" ID hose. If this length is
5
8
/
" NPT close pipe
1
2
/
" NPT 90° elbow, which
1
2