Glory Standard (8'x
8')
244.5 cm
/
96.3"
2
Glory
+
4'
Ext.
(8'x
12')
364 cm
/
143.3"
3
Glory
+
4'
Ext. x2
(8'x
16')
483.5 cm
/
190.4"
4
Glory
+
4'
Ext. x3
(8'x
20')
603 cm
/
237.4"
5
»
During Assembly
You
may
use
Silicon
lubricant
spray
in
order to help you
slide
the panels into the profiles.
Do
not
spray
the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
All panels
with the stamped words
THIS
SIDE
OUT
must
be
facing out to create
full
UV
protection.
Remove plastic sticker
as
panels
are
locked
in place.
During assembly you will encounter the information icon,
please refer
to the
relevant assembly step for additional comments and
assistance.
This icon indicates
that the installer should
be
inside the product.
This
icon indicates
that
Ithe
installer should
be
outside the product.
Step
3:
Refers
only for the extension
kit! The
extension kit contains
a
base
connector, either
part #8447
or
#7601
Step 9:
Please
make sure
the
screw
connection
is
made exactly
as
illustrated.
A
-
Connect the screw
in
the left
hole.
B -
Connect the screw
in
the right hole.
Step 10:
Peel
the film covering the
panel. Make sure
you install it
with the
UV
protected
side
out.
Step 12:
The screws
inserted
as
shown
in
drawing
b
are
to
be used
with
the anchoring parts at
the end
of
the assembly.
Step 18:
The screws
inserted
as
shown
in
drawing
c
are
to
be used
with
the anchoring parts at
the end
of
the assembly.
Step 20: Side Louver Window:
can be
located only on one of the
two
central
panels.
* If
you assemble the greenhouse
with
an
extension module, the
window
can be
placed on
all panels,
except for the
last
two
end panels.
*
Note:
The
selected placing will affect the next assembly
steps.
Step 22:
If
there
are screws in
the
rail
as
preparation for the anchoring
stage,
they
can be used
for the
side
louvre
window
instead
of
part
#
461.
It
is
not
be
possible to connect the anchoring part
here.
Step 28:
It
is
highly recommended to
paste
the sealing tape
at
the
bottom
edge of
panels
7903
+
7904
is
order to prevent moisture
seepage.
Step 35: Roof
window
can be
located only
on one
of
the two central roof
panels.
* If
you assemble the greenhouse
with
an
extension module, the roof windows must
be
placed on panels
only
as
specified
in
the manual.
*
Note:
The
selected placing will affect the next assembly
steps.
Step 40:
Please
tighten
screws
from inside the greenhouse.
In
addition,
please
tighten
the remaining
loose screws.
Step 45:
As
mentioned
at
the
'Before Assembly' section,
prior to
fitting
the
Automatic Vent
Opener,
the power-tube
has
to
be
cooled
by
placing it
in
a
refrigerator for approximately
30
minutes.
Step 54: Door
can be
installed
as
a
left hand door or right hand
door
as
per
your decision.
These
instructions show
a
right
hand
door
assembly.
Please
determine door opening direction.This decision will
affect the next assembly
steps.
Step 56:
Please
adjust the hinges height
in
accordance
with
the upper post and lower ramp
of
the door
aperture,
as
specified
in
Level
C.
Step 60: Threading parts 7888 exactly
as
specified
in
Level
B, is
very
important
in
order to
create
good
drainage.
Step 64: Anchor the shed on to
a
solid surface such
as
concrete or asphalt,
use
suitable
screws
and plugs.
(Screws
and plugs
are
not supplied).
Important
Recommendations
Firmly connect the greenhouse to
a
level surface
immediately after completion of the
assembly.
Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage in order for your warranty to
be
valid.
Tighten
all screws once assembly
is
completed.
Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your warranty to
be
valid.
Screws
411
and nuts 412
are used
throughout
the assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the
inside
of the
greenhouse.
If
not specified otherwise, do not fasten
screws
and nuts
(411 &
412)
for more than
2-3
turns.
Do
not tighten them until completion of the panels'assembly.
These
2
icons
indicate if
screw's
tightening
is
required or not.
However,
in
some steps,
temporary tightening of
a
few
screws may
be
needed
to prevent
a
profile from sliding out.